Browse
Search
2023-158-E-AMS-Woolpert-Orange County Public Schools Capital Needs Assessment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-158-E-AMS-Woolpert-Orange County Public Schools Capital Needs Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 9:28:56 AM
Creation date
4/17/2023 9:26:23 AM
Metadata
Fields
Template:
Contract
Date
4/11/2023
Contract Starting Date
4/11/2023
Contract Ending Date
4/13/2023
Contract Document Type
Contract
Amount
$984,561.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. CHCCS will use that to create the <br />aspirational list, especially for Lincoln <br />Center and Transportation building <br />(erosion problems) <br />3. Rani: <br />a. Basic needs vs aspirational <br />b. Walked through an older school <br />yesterday and was very apparent how <br />much better it would be to rebuild it vs <br />renovating <br />i. Still constrained by time and <br />energy even if had money <br />g. Bonnie <br />i. Our building and construction standards are too outdated <br />and don’t match between the two districts <br />1. Eric asked if Bonnie was referring to joint design <br />standards between both districts? Could draft <br />them but would be up to boards to review and <br />approve <br />a. DPI standards vs Orange County building <br />standards <br />ii. It takes too long to get projects completed <br />iii. Need to take weather conditions into account, too <br />h. Jean – Next agenda: <br />i. Discuss difference between OC standards and DPI <br />design standards? <br />1. Implications on costs? <br />ii. Joint bidding/shared contractors for projects across both <br />districts <br />1. Implications on costs? <br />iii. Outsourcing of maintenance for assets <br />iv. Someone to present on best practices for construction, <br />design, and maintenance standards <br />i. Patrick <br />i. Could they have longer than a month – lots of topics <br />discussed <br />ii. Eric said he could reach out to experts to come back and <br />present about construction standards but would need <br />longer than a month (the group agreed upon May as the <br />target date for the subject matter expert to share <br />information) <br />1. The group agreed this would be helpful <br />j. Jean <br />i. When could we get a spreadsheet with the “aspirational” <br />CIP? To be kept in mind when making decisions about <br />funding? <br />DocuSign Envelope ID: F3ECCCC4-11C5-4B8B-A148-28FAABFF6334
The URL can be used to link to this page
Your browser does not support the video tag.