Browse
Search
2023-158-E-AMS-Woolpert-Orange County Public Schools Capital Needs Assessment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-158-E-AMS-Woolpert-Orange County Public Schools Capital Needs Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 9:28:56 AM
Creation date
4/17/2023 9:26:23 AM
Metadata
Fields
Template:
Contract
Date
4/11/2023
Contract Starting Date
4/11/2023
Contract Ending Date
4/13/2023
Contract Document Type
Contract
Amount
$984,561.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Options for Structure Renovation or Replacement <br />Option One <br />Repair, replacement or renovation <br />of items, components or systems <br />that are important to the health <br />and safety of the students and <br />staff and to sustain the overall <br />operation of the facility. General <br />maintenance and system service <br />life upgrades. (state building code <br />violations, health department <br />violations, handicapped <br />accessibility issues, removal of <br />hazardous material, security <br />issues not being met by current <br />systems) <br />Option Two <br />Repair and renovation of long-range <br />items that also bring the class size <br />square footage of elementary <br />classrooms to 1,200 sf and/or meet <br />future capacity needs and the <br />Orange County School Building <br />Standards of 585 students for <br />elementary schools. (OC standard at <br />585 currently: New standard =517 <br />with class size changes) INTERIOR <br />RENOVATIONS BUILDING <br />ADDITION AND SITE <br />IMPROVEMENT MECHANICAL <br />SYSTEM UPGRADES MAJOR <br />BUILDING IMPROVEMENTS <br />Option 3 <br />Repair and renovation of long-range <br />items that also bring the class size <br />square footage of elementary <br />classrooms to 1,200 sf and/or meet <br />future capacity needs and the <br />Orange County School Building <br />Standards of 637 students for <br />elementary schools. Utilize <br />sustainable approaches to extend <br />building life while reducing overall <br />maintenance and operation costs. <br />(DPI building size old standard= <br />700 students/ new standard with <br />class size changes =637 students) <br />DocuSign Envelope ID: F3ECCCC4-11C5-4B8B-A148-28FAABFF6334
The URL can be used to link to this page
Your browser does not support the video tag.