Orange County NC Website
ORANGE HIGH SCHOOL Major Capital Projects Requiring Additional Funding 1,399 <br /> 1,296 <br />1962 <br />CAPACITY <br />IMPACT 2 <br />Option LOW HIGH <br />1 $524,180 $975,000 N <br />Subtotal $524,180 $975,000 0 <br />Option LOW HIGH <br />3 $4,393,420 $5,491,775 TBD <br />Subtotal $4,393,420 $5,491,775 TBD <br />Option LOW HIGH <br />1 ROOF REPLACEMENTS (400/AUX GYM)$350,000 $525,000 N <br />1 $121,198 $151,497 N <br />1 $1,132,112 $1,455,572 N <br />1 $1,375,595 $1,790,697 N <br />Subtotal $2,978,904 $3,922,766 0 <br />Option LOW HIGH <br />1 $266,938 $348,065 N <br />1 $1,363,475 $1,666,470 N <br />1 $699,917 $769,606 N <br />1 $143,922 $159,072 N <br />1 $1,222,252 $1,584,344 N <br />1 $485,191 $808,651 N <br />Subtotal $4,181,696 $5,336,208 0 <br />$12,078,201 $15,725,749 TBD <br />8 <br />Option 1 <br />Option 2 <br />Option 3 <br />Grand Total (2024 Costs w/increased capacity) <br />Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br />REVISED DATE: 1/8/2022 <br />Number of mobile units currently on site <br />Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br />Assessment as well as projects that have been identified since that study. None of the projects listed have been fully funded. <br />1 School Capacity: Orange County NC Schools Adequate Public Facilities Ordinance (SAPFO). Annual membership count November 15, 2019. Level of <br />Service (LOS) means the amount (level) of students that can be accommodated (serviced) at certain school system grade group. [i.e., Elementary level <br />(K-5), Middle Level (6-8), High School Level (9-12)] Standards for LOS: Elementary 105%, Middle 107%, High School 110%. Source: Orange County NC <br />SAPFO Annual Report. Class size reduction phase-in based on House Bill 90 (SL 2017). Allotment and average class size in grades K-3 shall be at the <br />following ratios for 2021-2022: Kindergarten (1:18), 1st Grade (1:16), 2nd & 3rd Grade (1:17). <br />2Capacity Impact: Y/N (number indicates number of potential seats gained or lost.) <br />Priority Ranking KeyRepair, replacement or renovation of items, components or systems that are important to the health and safety of the students and <br />staff and to sustain the overall operation of the facility. General maintaince and system service life upgrades. (state building code <br />violations, health department violations, handicapped accessibility issues, removal of hazardous material, security issues not <br />being met by current systems) <br />INTERIOR RENOVATIONS: NON-ACCESSIBLE GROUP RESTROOMS <br />INTERIOR RENOVATIONS: WOOD GYM FLOORS REFURBISH <br />LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE <br />NEW EMERGENCY GENERATOR LIGHTING <br /> <br />ELECTRICAL SYSTEMS UGRADE <br /> MAJOR BUILDING IMPROVEMENTS <br />FOOD SERVICE RENOVATIONS <br />BACK DRIVEWAY REPAIR <br />REPLACE WORKFORCE DEVELOPMENT BUILDING <br /> MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH <10 <br />YEARS OF USABLE LIFE <br />NEW BOILER- FIELD HOUSE <br />ENERGY MANAGEMENT SYSTEM UPGRADE <br /> <br />SAFETY <br />IMPLEMENT SECURITY RECOMMENDATIONS <br /> <br />NEW CONSTRUCTION & BUILDING ADDITIONS <br />School Capacity1 <br />SAPFO CAPACITY <br />MEMBERSHIP COUNT <br />AGE OF SCHOOL/BUILDINGS <br />PROJECT PRIORITY & CATEGORY ESTIMATED RANGE OF COST <br />DocuSign Envelope ID: F3ECCCC4-11C5-4B8B-A148-28FAABFF6334