Orange County NC Website
EFLAND CHEEKS GLOBAL ELEMENTARY S Major Capital Projects Requiring Additional Funding 455 <br /> 499 <br />1952 <br />CAPACITY <br />IMPACT 2 <br />Option LOW HIGH <br />1 $100,000 $140,000 N <br />Subtotal $140,000 0 <br />Option LOW HIGH <br />2 $2,485,502 $2,982,602 126 <br />2 $908,983 $1,045,331 TBD <br />Subtotal $3,394,485 $4,027,933 TBD <br />Option LOW HIGH <br />3 $318,144 $363,593 N <br />1 $345,102 $443,702 N <br />1 $121,198 $151,497 N <br />1 $48,479 $60,599 N <br />1 $2,366,411 $2,760,813 N <br />Subtotal $3,199,334 $3,780,204 0 <br />Option LOW HIGH <br />1 $278,906 $332,385 N <br />1 $181,797 $206,036 N <br />1 $357,221 $467,942 N <br />1 $147,901 $246,501 N <br />Subtotal $965,825 $1,252,864 0 <br />#VALUE!$9,201,001 TBD <br />0 <br />Option 1 <br />Option 2 <br />Option 3 <br />School Capacity1 <br />SAPFO CAPACITY <br />MEMBERSHIP COUNT <br />AGE OF SCHOOL/BUILDINGS <br />PROJECT PRIORITY & CATEGORY ESTIMATED RANGE OF COST <br /> <br />SAFETY <br />IMPLEMENT SECURITY RECOMMENDATIONS <br /> <br />NEW CONSTRUCTION & BUILDING ADDITIONS <br />CLASSROOM EXPANSION <br />PRE-K ADDITION <br /> MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH <10 <br />YEARS OF USABLE LIFE <br />ROOF REPLACEMENT <br />ENERGY MANAGEMENT SYSTEM UPGRADE <br />NEW BOILER <br />NEW COOLING TOWER <br />TOTAL HVAC REPLACEMENT <br /> MAJOR BUILDING IMPROVEMENTS <br />FOOD SERVICE RENOVATIONS <br />EXTERIOR RECOMMENDED REPAIRS <br />LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE <br />NEW EMERGENCY GENERATOR LIGHTING <br /> <br />Grand Total (2024 Costs w/increased capacity) <br />Repair, replacement or renovation of items, components or systems that are important to the health and safety of the students and <br />staff and to sustain the overall operation of the facility. General maintaince and system service life upgrades. (state building code <br />violations, health department violations, handicapped accessibility issues, removal of hazardous material, security issues not <br />being met by current systems) <br />Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br />REVISED DATE: 1/8/2022 <br /> <br />Number of mobile units currently on site <br />Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br />Assessment as well as projects that have been identified since that study. None of the projects listed have been fully funded. <br />1 School Capacity: Orange County NC Schools Adequate Public Facilities Ordinance (SAPFO). Annual membership count November 15, 2019. Level of <br />Service (LOS) means the amount (level) of students that can be accommodated (serviced) at certain school system grade group. [i.e., Elementary level <br />(K-5), Middle Level (6-8), High School Level (9-12)] Standards for LOS: Elementary 105%, Middle 107%, High School 110%. Source: Orange County NC <br />SAPFO Annual Report. Class size reduction phase-in based on House Bill 90 (SL 2017). Allotment and average class size in grades K-3 shall be at the <br />following ratios for 2021-2022: Kindergarten (1:18), 1st Grade (1:16), 2nd & 3rd Grade (1:17). <br />2Capacity Impact: Y/N (number indicates number of potential seats gained or lost.) <br />Priority Ranking Key <br />DocuSign Envelope ID: F3ECCCC4-11C5-4B8B-A148-28FAABFF6334