Orange County NC Website
AL STANBACK MIDDLE SCHOOL Major Capital Projects Requiring Additional Funding 740 <br /> 653 <br />1995 <br />CAPACITY <br />IMPACT 2 <br />Option LOW HIGH <br />1 $100,000 $140,000 N <br />Subtotal $100,000 $140,000 0 <br />Option LOW HIGH <br /> <br />Subtotal $0 $0 0 <br />Option LOW HIGH <br />1 $242,396 $302,994 N <br />3 $515,091 $721,127 N <br />1 NEW CHILLER $605,989 $757,486 N <br />Subtotal $1,363,475 $1,781,607 0 <br />Option LOW HIGH <br />3 $136,348 $166,647 N <br />1 $9,090 $10,908 N <br />3 $252,495 $378,743 N <br />1 $745,366 $975,642 N <br />1 $309,054 $515,091 N <br />1 EXTERIOR RECOMMENDED REPAIRS $605,989 $681,738 N <br />Subtotal $2,058,342 $2,728,768 0 <br />$3,521,818 $4,650,376 0 <br />0 <br />Option1 <br />Option2Option3 <br />Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf <br />and/or meet future capacity needs and the Orange County School Building Standards of 585 students for elementary schools. <br />Repair and renovation of long-range items that also bring the class size square footage of elementary classrooms to 1,200 sf <br />REVISED DATE: 2/20/20 <br />NEW EMERGENCY GENERATOR LIGHTING <br /> <br />Grand Total3 (2024 cost estimate): <br />Number of classrooms below DPI minimums sf: TBD Number of mobile units: <br />Note: The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br />Assessment as well as projects that have been identified since that study. None of the projects listed have been fully funded. <br />1 School Capacity: Orange County NC Schools Adequate Public Facilities Ordinance (SAPFO). Annual membership count November 15, 2019. Optionof <br />Service (LOS) means the amount (level) of students that can be accommodated (serviced) at certain school system grade group. [i.e., Elementary <br />Option(K-5), Middle Option(6-8), High School Option(9-12)] Standards for LOS: Elementary 105%, Middle 107%, High School 110%. Source: Orange <br />County NC SAPFO Annual Report. Class size reduction phase-in based on House Bill 90 (SL 2017). Allotment and average class size in grades K-3 <br />shall be at the following ratios for 2021-2022: Kindergarten (1:18), 1st Grade (1:16), 2nd & 3rd Grade (1:17). <br />2 Impact: Y/N (number indicates number of potential seats gained or lost.) <br />3 Annual inflationary construction cost is calculated at 6%. <br />Priority Ranking Key <br />Repair, replacement or renovation of items, components or systems that are important to the health and safety of the students and <br />staff and to sustain the overall operation of the facility. General maintaince and system service life upgrades. (state building code <br />violations, health department violations, handicapped accessibility issues, removal of hazardous material, security issues not <br />being met by current systems) <br />MAJOR BUILDING IMPROVEMENTS <br />RENOVATE 6TH GRADE CLASSROOM WING <br />FOOD SERVICE RENOVATIONS <br />INTERIOR FACILITIES UPGRADES AND REPAIRS: SCIENCE ROOM <br />LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE <br /> MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH <10 <br />YEARS OF USABLE LIFE <br />NEW BOILER <br />ENERGY MANAGEMENT SYSTEM UPGRADE <br /> <br /> <br />SAFETY <br />IMPLEMENT SECURITY RECOMMENDATIONS <br /> <br />NEW CONSTRUCTION & BUILDING ADDITIONS <br />School Capacity1 <br />SAPFO CAPACITY <br />MEMBERSHIP COUNT <br />AGE OF SCHOOL/BUILDINGS <br />PROJECT PRIORITY & CATEGORY ESTIMATED RANGE OF COST <br />DocuSign Envelope ID: F3ECCCC4-11C5-4B8B-A148-28FAABFF6334