Orange County NC Website
<br /> <br />9 <br />management and the support staff that will be used in this project, including: <br />i. A narrative of how the staff will function during each phase or stage of <br />the project <br />ii. Each position within the Project Organization and the role and <br />responsibilities of the individual(s) in that position <br />iii. Number of teams and number of personnel to serve on each team (if <br />more than one team is required to meet the project schedule) <br />iv. Composition of each typical team; typical teams are expected to include <br />an architect, mechanical engineer, and electrical engineer at a <br />minimum. Additionally, there should be at least one individual <br />experienced in demographics, Geographic Information Systems (GIS), <br />and or with school assignment boundary creation and or revision. <br />v. Composition of special teams or positions, which may be used on an as <br />needed basis. <br />vi. The role of the Consultant’s sub-Consultant(s) <br />b. Resumes of the team members that will be assigned to the project. Resumes <br />should demonstrate their education and recent experience performing similar <br />services and if these individuals are part of the Consultant’s firm or sub- <br />Consultants. <br />i. Experience on public PreK-12 projects of similar size, scope, complexity and <br />budget <br />ii. Professional certifications and technical expertise <br />iii. Indicate whether the key personnel have worked together on previous <br />projects and list that project information, including owner contact <br />information <br />iv. Minimum of one (1), but no more than three (3), references for all key <br />personnel, including current telephone numbers and emails for persons with <br />whom they have had prior business relationships and/or contracts within the <br />last three years <br />v. Identify whether person is an employee of the firm and length of <br />employment, or an outside employee and the name of the employer <br /> <br />Tab 3 – Project Methodology <br />Detailed descriptions of the management plan to be used to accomplish the work. Include the <br />proposed methodology, the schedule, and the process to be used for this RFQ. Please list, <br />categorize and submit samples of all deliverables. <br /> <br />Tab 4 – Previous Projects and References <br />Short description of recent projects that demonstrate successful performance conducting <br />PreK-12 public school assignment optimization and facilities condition assessments of equal <br />complexity. Include three (3) references, with a contact name, email and phone number that <br />the Districts may contact. It is preferred that references include those clients for whom the <br />respondent has provided services similar in nature, quantity and quality to those requested in <br />this RFQ. <br /> <br />Tab 5 – Financial Statements <br />Provide financial statements for the last three years. Include a statement of the firm’s <br />DocuSign Envelope ID: F3ECCCC4-11C5-4B8B-A148-28FAABFF6334