Orange County NC Website
Inclusions <br />1.Freight <br />2.Engineering <br />3.Project Management for Siemens Scope of work <br />4.System Commissioning and Final Pretest <br />5.Final AHJ Testing and certification <br />6.Fire Alarm Submittal to customer <br />7.Fire Alarm Submittal to AHJ <br />8.Fire Alarm Permit for the Passmore and Solty center only <br />9.Professional Engineers stamp which may be required <br />10.Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br />11.As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br />12.Demolition of the existing fire alarm system <br />13.Price is based on Auto-CAD electronic drawings for the project being supplied to us by others <br />14.DACT <br />15.One (1) year warranty <br />16.Customer training <br />17.Final wiring terminations to the control panel <br />18.One (1) submittals <br />19.One (1)O&M manuals <br />20.Programming <br />21.Alarm Crosstie with the intent to leave the existing panel and monitoring in place until SportsPlex <br />modification is completed <br />22.120 VAC Fire Alarm power <br />23.10% Fire Alarm Testing <br />Page 6 of 13 <br />DocuSign Envelope ID: B15E37A2-EA23-4805-A382-5F013356CE60