Browse
Search
2023-155-E-AMS-Siemens Industry-Passmore and Adult Day replace upgrade fire system
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-155-E-AMS-Siemens Industry-Passmore and Adult Day replace upgrade fire system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 9:23:51 AM
Creation date
4/17/2023 9:23:30 AM
Metadata
Fields
Template:
Contract
Date
4/13/2023
Contract Starting Date
4/13/2023
Contract Ending Date
4/16/2023
Contract Document Type
Contract
Amount
$121,514.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clarifications <br />1.Siemens will provide the fire alarm permit, review and inspection fees. <br />2.Siemens crosstie will include Fire alarm notification only with the expectation that the existing <br />Sportsplex FACP is being monitored by third party provider. <br />3.Siemens new FACP will include pointe id for all new devices through our Central Monitoring Station. <br />4.Siemens will need to be provided with architectural backgrounds in Auto CAD files, <br />5.Siemens will provide One (1) submittal sets of drawings, as well as One (1)construction sets, and One <br />(1)as built sets.An electronic and hard set of approved and stamped as builds will be provided to the <br />Owner upon the project completion. <br />6.Owner will need to allow Siemens full and complete access to the property for the duration of the <br />project. <br />7.Project will be performed under one (1) phase and will need to have the Owner's input and will require <br />the Owner's cooperation to complete during the allotted time. <br />8.Submittals may take between 4-6 weeks for approval through the Fire Department. <br />9.All work to be performed during normal working hours of Monday thru Friday, 6:00am to 4:00pm. <br />10.If this proposal includes a Smoke Control/Smoke Management system, Siemens must be provided <br />Smoke Control/Smoke Management Drawings which define all Zone Boundaries, location, type of <br />equipment used, and a detailed input/output matrix or sequence of operations.In the event that such <br />information is provided post-award or such information is discovered by Siemens during installation of <br />the scope, a change order for additional time and an increase in cost may be required due to the <br />information differing from assumptions that Siemens had to make in developing the scope. <br />Page 5 of 13 <br />DocuSign Envelope ID: B15E37A2-EA23-4805-A382-5F013356CE60
The URL can be used to link to this page
Your browser does not support the video tag.