Browse
Search
Agenda - 04-18-2023; 6-a - Orange County Transportation Priority List for SPOT 7.0 - FY 2026-2035 STIP
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 04-18-2023 Business Meeting
>
Agenda - 04-18-2023; 6-a - Orange County Transportation Priority List for SPOT 7.0 - FY 2026-2035 STIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:19:34 AM
Creation date
4/13/2023 11:26:09 AM
Metadata
Fields
Template:
BOCC
Date
4/18/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for April 18, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 04-18-2023 Business Meeting
Minutes-04-18-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-023-2022 Annual Report for Orange County’s CDBG-CV Grant
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-024-Amendment to the Charge for the Schools Safety Task Force
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-014-Orange County Transportation priority list for spot 7.0 FY-2026-2035 STIP
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> Attachment 2:Draft Triangle Area Rural Planning Organization(TARPO)Project List <br /> Recommendations <br /> MPO/ AADT 2010- Crashes 2006- <br /> Map RPO Project Description/Need 2016 2016 2018 Results <br /> Staff OUTBoard <br /> Description:Modernize Mebane Oaks Road(SR 1007)from NC 54 to 1-85 with NCDOT standard street cross- <br /> section 2B(60'row,11'travel lanes,with 5'paved shoulder),add turn lanes and safety improvements at Old <br /> Hillsborough Road Road(SR-2126),Hebron Church Road(SR-1139),Yarborough Road(SR-1138),Oak Grove north 4400-3400 Total 161 <br /> Church Road(SR-1117),Jones Road(SR-1123),S Jim Minor Road(SR-2135),Nicks Road(SR-1119), 2 fatal <br /> Mebane Oaks Road Bradshaw Quarry Road(SR-1100),and NC-54 4 serious injury <br /> 6 TARPO (SR-1007) 19 minor injury N/A Approval Approval <br /> Improvement** Need:This project would provide multimodal and safety improvements along a north-south corridor that 31 possible injury <br /> connects Orange and Alamance County.This corridor is growing more unsafe with increasing accidents,two of 105 property <br /> south 2400-2400 damage <br /> them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce crash frequencies <br /> and better manage traffic at key locations along the corridor. <br /> Description:Modernize Old NC-86(SR-1009)from 1-40 to Eubanks Road(SR-1727)with NCDOT standard <br /> street cross-section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes at Davis Road(SR- north 5500-6300 Total 208 <br /> 1129),and New Hope Church Road(SR-1723) 3 fatal <br /> Old NC-86 3 serious injury <br /> TARPO Need:This project would provide multimodal and safety improvements along a north-south corridor for <br /> 7 (SR-1009) 15 minor injury N/A Approval Approval <br /> /DCHC commuters travel between Hillsborough and Carrboro.This corridor is growing more unsafe with increasing <br /> Improvement** accidents,three of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce 24 possible injury <br /> south 4500- <br /> crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will sou 5000 163 property <br /> continue increasing making the area more hazardous and will eventually exceed the capacity of the existing damage <br /> road. <br /> Description:Widen from NC-57 to Caswell County Line with additional lanes and multimodal facilities along the Total 609 <br /> corridor and safety improvements at each intersection. north 4700-5700 g fatal <br /> Need:This project would provide multimodal and safety improvements along a north-south corridor for 6 serious injury <br /> 8 TARPO NC-86 Improvement** commuters travel between Orange and Caswell County.This corridor is growing more unsafe with increasing 46 minor injury N/A Approval Approval <br /> accidents,nine of them being fatal.Intersection improvements such as crosswalks and turn lanes will reduce south 11000- 111 possible <br /> crash frequencies and better manage traffic at key locations along the corridor.Traffic along this corridor will 11000 injury <br /> 437 property <br /> continue increasing making the area more hazardous and will eventually exceed the capacity of the existing <br /> damage <br /> road. <br /> Description:Widen NC-54 from Orange Grove Rd(SR 1006)to Butler Rd(SR 1951)/Dodsons Cross Rd(SR <br /> 1102)and from Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)to Old Fayetteville Road(SR-1107)/ East 12000- Total 340 <br /> Inside DCHC with additional lanes and multimodal facilities along the corridor and safety improvements at each 15000 3 fatal <br /> TARPO intersection. 8 serious injury 61.80 Region <br /> 9 NC-54 Improvement** 35 minor injury Approval Approval <br /> /DCHC Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will 61 possible injury 26.58 Division <br /> substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 9300- 233 property <br /> widening.NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic 10000 damage <br /> and crashes along corridor. <br /> Description:Widen from Mebane Oaks Road(SR-1007)to Orange Grove Rd(SR 1006)with additional lanes East 9300-10000 <br /> and multimodal facilities along the corridor and safety improvements at each intersection. Total 163 <br /> 1 fatal <br /> Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will 4 serious injury <br /> 10 TARPO NC-54 Improvement** 19 minor injury N/A Approval Approval <br /> substantially exceed the existing roadway capacity by 2035,warranting an increase in capacity through West 5800-6000 20 possible injury <br /> widening.NC-54 West Corridor Study provides such recommendations necessary to address increasing traffic 119 property <br /> and crashes along corridor damage <br /> Notes: <br /> *STI Law§136-189.11.Transportation Investment Strategy Formula section(d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. <br /> **Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for 1'`5 feet of sidewalk and 100%Orange County for any additional sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.