Browse
Search
Agenda - 04-18-2023; 6-a - Orange County Transportation Priority List for SPOT 7.0 - FY 2026-2035 STIP
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 04-18-2023 Business Meeting
>
Agenda - 04-18-2023; 6-a - Orange County Transportation Priority List for SPOT 7.0 - FY 2026-2035 STIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:19:34 AM
Creation date
4/13/2023 11:26:09 AM
Metadata
Fields
Template:
BOCC
Date
4/18/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for April 18, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 04-18-2023 Business Meeting
Minutes-04-18-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-023-2022 Annual Report for Orange County’s CDBG-CV Grant
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-024-Amendment to the Charge for the Schools Safety Task Force
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-014-Orange County Transportation priority list for spot 7.0 FY-2026-2035 STIP
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List <br /> Recommendations <br /> MPO/ AADT 2010- Crashes 2006- <br /> Map RPO Project Description/Need 2016 2016 2018 Results <br /> Staff OUTBoard <br /> Description:Modernize Dairyland Road(SR-1177)from Orange Grove Road(SR-1006)to Old NC-86(SR-1009)with <br /> NCDOT standard street cross-section section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety Total 121 County Priority <br /> improvements at Orange Grove Road(SR-1006),Dodson Crossroads(SR-1102),Rocky Ridge Road(SR-1113), Bethel west 940-970 2 fatal <br /> DCHC Dairyland Road Hickory Grove Church Road(SR-1104)and convert intersection at Old NC-86(SR-1009)to Roundabout. 2 serious injury Not submit to <br /> NCDOT for P5.0 <br /> 7 /TARP (SR-1177) 15 minor injury Approval Approval <br /> O Improvement" Need:This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the 16 possible injury ° <br /> Bkhom Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized No 20/local uc <br /> south 2400 property <br /> vehicular travel.The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its sou - 86 match or local <br /> rural context and is only eligible for funding in the division tier. 3100 damage administration <br /> Description:Modernize Dodson Crossroad(SR-1102)from Orange Grove Road(SR-1006)to NC-54 with NCDOT standard County Priority <br /> street cross-section section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety improvements at north 830-1000 Total 62 <br /> Orange Grove Road(SR-1106),Borland Road(SR-1126),Arthur Minnis Road(SR-1115),and Dairyland Road(SR-1177) 2 serious injury Not submit to <br /> DCHC Dodson Crossroad 8 minor injury NCDOT for P5.0 <br /> 8 /TARP (SR-1102) Need:This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from Approval Approval <br /> 10 possible injury <br /> O Improvement the area south of the schools and connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. south 1800- 42 property No 20%local <br /> The project would also improve safety for motorized vehicular travel on this segment of Orange Grove Road.The project is 1800 damage match or local <br /> not likely to score very high using the State's bike/pedestrian scoring factors because of its rural context and is only eligible administration <br /> for funding in the division tier. <br /> Description:Modernize Orange Grove Road(SR-1106)from 1-85 to Dodson Crossroad(SR-1007)with NCDOT standard <br /> street cross-section section 2B(60'row,11'travel lanes,with 5'paved shoulder), add turn lanes and safety improvements at north 4700- Total 102 County Priority <br /> Ode Turner Road(SR-1130),Dimmocks Mill Road(SR-1134),Crossroad Church Cemetery Road(SR-1131),Davis Drive <br /> DCHC Orange Grove (SR-1129),Kimbro Road(SR-1128)and Dodson Crossroads(SR-1102) 4600 1 seriousalnjury NCDOT for P5.0 Not submit to <br /> 9 /TARP Road(SR-1006) 7 minor injury Approval Approval <br /> O Improvement— Need:This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the 13 possible injury ° <br /> B uckhom 80r rt <br /> Road and Mebane area and improve the safety of the subject thoroughfare for both bicyclists and motorized No 20/o local <br /> vehicular travel.The project is not likely to score very high using the State's bike/pedestrian scoring factors because of its south 2400- popey match or local <br /> rural context and is only eligible for funding in the division tier. 3100 damage administration <br /> Description:Widen NC-54 from Orange Grove Rd(SR 1006)to Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)and from East 12000- <br /> Butler Rd(SR 1951)/Dodsons Cross Rd(SR 1102)to Old Fayetteville Road(SR-1107)/Inside DCHC with additional lanes 15000 <br /> and multimodal facilities along the corridor and safety improvements at each intersection. <br /> Total 340 <br /> Need:NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will substantially 3 fatal <br /> exceed the existing roadway capacity by 2035,warranting an increase in capacity through widening.NCDOT traffic figures <br /> DCHC 8 serious injury 61.80 Region <br /> NC-54 already indicate that traffic along the segment of NC 54 from Butler Road/Dodsons Cross Road to Neville Road is at capacity 10 !TARP y 9 9 p y 35 minor injury Approval Approval <br /> O Improvement— and will only continue to substantially exceed capacity in future years.It is likely that traffic along the segment of NC 54 from 61 possible injury 26.58 Division <br /> Neville Road to Old Fayetteville Road is also at or over capacity.Specific user input on the subject corridor reveals the lack of West 9300- 233 property <br /> usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signalization. 10000 damage <br /> User input also reveals the presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate <br /> storage for left and right turns at some intersecting streets and entrances to businesses along the corridor. <br /> Description:Intersection and safety improvements along Lebanon Road(SR-1306)from Mill Creek Road(SR-1345)to East 2600—3000 Total 100 <br /> Efland-Cedar Grove Road(SR-1004) 2 serious injury <br /> 11 DCHC Lebanon Road 12 minor injury N/A Approval Approval <br /> /BG 11 possible injury <br /> Need:Road continues experiencing increasing traffic and crashes,intersection and safety improvements along the corridor West 21002300 75 property <br /> will help provide safe travel for all users. - damage <br />
The URL can be used to link to this page
Your browser does not support the video tag.