Browse
Search
Agenda - 04-18-2023; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 04-18-2023 Business Meeting
>
Agenda - 04-18-2023; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:22:31 AM
Creation date
4/13/2023 11:01:15 AM
Metadata
Fields
Template:
BOCC
Date
4/18/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for April 18, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 04-18-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br /> 1 Slide #22 <br /> Planning Options — Key Issues <br /> OLD JAIL FACILITY & SITE <br /> Status—Vacant,Property size is 1.52 acers&includes Court St.Annex *i, <br /> Options rt S Ir.•1 Ann.x <br /> 1. De-construct,build parking lot for Justice Center needs.Preserve <br /> land for long range growth/needs I .- <br /> 2. if link Bldg-is not renovated....De-construct old Jail,bui€d a I <br /> om�rl <br /> 26,DD6 G S F Justice Center Annex to meet Justice Department .I=R f. t" <br /> Courthouse M. <br /> growth needs A <br /> Cost <br /> 1.De-construct Jail,build new parking lot.Approx.$1,500,000 <br /> 2.26,6D6 SF Justice Annex:Approx.$15,600,DDD ($605/SF) <br /> I J � <br /> Recommendation <br /> • De-construct old Jail—Build a partying lot and open space <br /> • Preserve space for future Justice Center growth/needs I - <br /> FalllfCr] <br /> Site can support 26,0DQ G5F facility <br /> 2 • i` tslwer Palk J <br /> 3 Chair Bedford asked if the annex could have office space and courtrooms. 11 <br /> 4 Jay Smith said it could be both. He said that district and superior courts both need room <br /> 5 to grow. <br /> 6 Chair Bedford said she was thinking that the space in Link and the annex at the old jail <br /> 7 site might be necessary. <br /> 8 Jay Smith continued the presentation and discussed the need for parking. He said at no <br /> 9 time was selling the old jail site considered because it is important for future growth needs. <br /> 10 Chair Bedford said it was her understanding that courts could not be located in Link. <br /> 11 Jay Smith said that is correct and that current growth needs to happen within the <br /> 12 courthouse space. <br /> 13 <br /> 14 Slide #23 <br /> Planning OpKey Issues <br /> SHERIFF'S OFFICE <br /> T i <br /> Status—18,285 5F on ground floor of existing Courthouse.31,496 5F <br /> needed by 2040.Justice Cntr,growth would displace Sheriff's office <br /> Options <br /> 1. Move out of Courthouse—build new Sheriff's Ofice at Motor <br /> Pool Site District '. <br /> Pill <br /> Auer2. Remain in Courthouse-build 3 story addition onto East side of <br /> existing Courthouse for Sheriff and other Justice Department 0. <br /> needs I1 <br /> Costi <br /> Farmers <br /> 1. Approx,$11,680,000 (31,000 SF @$565/SF) M,rar <br /> 2. Approx.$25,000,000 (40,OD0 SF) <br /> Recommendation It' '.rMk { <br /> • Build new Sheriff's Office at Motor Pool Site + <br /> 15 f ` . <br />
The URL can be used to link to this page
Your browser does not support the video tag.