Orange County NC Website
52 <br /> Project 1 18GOT_CD12 Project Transit Project Other Bus <br /> Category Infrastructure Subcategory Service <br /> Project Description Project <br /> This project will construct accessibility and amenity Project Title Orange County Bus Stop <br /> improvements at high ridership GoTriangle stops within Improvements <br /> Orange County that are currently unimproved and do not Agency GoTriangle <br /> meet Americans with Disability Act (ADA) requirements. <br /> This project is in progress: stop improvements have beerfill <br /> identified and design is complete at four stops. Design is FY24 Costs $50,000 <br /> underway at additional locations. <br /> FY25 Programmed N/A <br /> Rising costs and complex site conditions such as flood- Costs <br /> plain, utilities, drainage, and slopes at multiple sites have <br /> increased the estiated construction costs. GoTriangle Start Date July 2023 <br /> requests $50,000 in additional Orange County Transit <br /> Plan dollars to be matched by an application for$200,00 0 <br /> in federal funds from DCHC MPO's Regional Flexible <br /> Funding program. <br /> This project additionally covered design costs associated <br /> with the five completed Orange County Public Transit <br /> Stops, constructed by Orange County (Transit Plan <br /> project ID 190PTCD01). <br /> DRAFT <br /> FEBRUARY 15, 2023 <br />