| 18
<br />		Burlington-Graham MPO:
<br />     		1)  US-70  Improvements:  Widen  US-70 and  improve  intersections from  Buckhorn  Road  (SR-
<br />   			1114) to  Durham  County with  NCDOT standard  street cross-section 4G  (110'  row,  17.5'
<br />   			median,  11'  travel  lanes,  5'  bike  lane,  c&g,  and  sidewalk),  add  turn  lanes  and  safety
<br />   			improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004),
<br />   			Frazier Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette
<br />   			Mill  Road  (SR-1328),  Miller Road  (SR-1555),  Lawrence  Road  (SR-1561),  Palmers Grove
<br />  			Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR-
<br />   			1588), and N Scotswood Boulevard (SR-2300).
<br />     		2)  Mattress  Factory Road  Interchange:   Construct a new interchange at the existing grade-
<br />  			separated crossing of Mattress Factory Road and 1-85/1-40.
<br />     		3)  Mattress Factory Road Extension to U.S. 70:  Extend Mattress Factory Road northward across
<br />   			East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S.
<br />  			70 and close the existing railroad crossover road connecting East Washington Street and U.S.
<br />  			70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East
<br />  			Washington Street.
<br />     		4)  Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road
<br />  			(SR1144)  to  multiple  lanes  with  bicycle  and  pedestrian  facilities  with  grade  separation
<br />  			connection at US-70.
<br />     		5)  Lebanon Road  Improvements:  Intersection and safety improvements along Lebanon Road
<br />  			(SR-1306) from Mill Creek Road (SR-1345) to Efland-Cedar Grove Road (SR-1004).
<br />     		6)  Mebane Oaks Road Improvements: Modernize Mebane Oaks Road (SR 1007) from NC 54 to
<br />   			1-85 with NCDOT standard street cross-section 2B (60' row, 11' travel lanes, with 5' paved
<br />  			shoulder),   add turn lanes and safety improvements at Old Hillsborough Road Road (SR-
<br />  			2126),  Hebron Church Road  (SR-1139), Yarborough  Road (SR-1138), Oak Grove Church
<br />   			Road (SR-1117), Jones Road (SR-1123), S Jim Minor Road (SR-2135), Nicks Road (SR-
<br />   			1119), Bradshaw Quarry Road (SR-1100), and NC-54.
<br />		Triangle Area RPO:
<br />     		1)  Old Greensboro Road Paved Shoulders: Modernize Old Greensboro Road (SR-1005) from
<br />  			Jones Ferry Road (SR-1942) to Alamance County with NCDOT standard street cross-section
<br />  			2B (60' row, 11' travel lanes, with 5' paved shoulder),  add turn lanes and safety improvements
<br />  			at  Jones  Ferry  Road  (SR-1942),  Hatch  Road  (SR-1944),  Neville  Road  (SR-1945),  Carl
<br />   			Durham Road (SR-1950), White Cross Road (SR-1951), Wildcat Creek Road (SR-1953), and
<br />  			Orange Chapel Clover Garden Road (SR-1956).
<br />     		2)  Efland-Cedar Grove Road Improvements: Widen Efland-Cedar Grove Road (SR 1004) from
<br />   			Highland Farm Road (SR 1332) to Carr Store Road (SR 1352) with NCDOT standard street
<br />  			cross-section 2B (60' row, 11' travel lanes, with 5' paved shoulder),  add turn lanes and safety
<br />   			improvements at Carr Street (SR-1357) and highland Farm Road (SR-1332)
<br />     		3)  Orange Grove Road Improvements: Modernize Orange Grove Road (SR-1106) from 1-85 to
<br />   			Dodson Crossroad (SR-1007) with  NCDOT standard street cross-section 2B (60' row,  11'
<br />  			travel lanes, with 5' paved shoulder),  add turn lanes and safety improvements at Ode Turner
<br />   			Road (SR-1130), Dimmocks Mill Road (SR-1134), Crossroad Church Cemetery Road (SR-
<br />   			1131), Davis Drive (SR-1129), Kimbro Road (SR-1128) and Dodson Crossroads (SR-1102)
<br /> |