Browse
Search
Agenda - 04-18-2023; 6-a - Orange County Transportation Priority List for SPOT 7.0 - FY 2026-2035 STIP
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 04-18-2023 Business Meeting
>
Agenda - 04-18-2023; 6-a - Orange County Transportation Priority List for SPOT 7.0 - FY 2026-2035 STIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:19:34 AM
Creation date
4/13/2023 11:00:22 AM
Metadata
Fields
Template:
BOCC
Date
4/18/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for April 18, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 04-18-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Attachment 5:Draft Durham-Chapel Hill-Carrboro(DCHC)MPO Project List <br /> Recommendations <br /> MPO/ AADT 2010- Crashes 2006- <br /> Map RPO Project Description/Need 2016 2016 2018 Results <br /> Staff OUTBoard <br /> Description:Construct a pedestrian bridge over 140 alongside Orange Grove Road(SR 1006),construct a sidewalk along the <br /> north side of Orange Grove Road(SR 1006)from the pedestrian bridge to Timbers Drive,construct sidewalks along both <br /> sides of New Grady Brown School Road with a midblock crossing,and construct a sidewalk along one side of Oakdale Drive Not submit to <br /> from Cheshire Drive to Orange Grove Road. NCDOT for to <br /> Orange Grove Prohibited by Prohibited by <br /> 18 DCHC Road/1-40 Need:1-40 separates two schools,Grady Brown Elementary and Cedar Ridge High School,from residential areas north of I- N/A No 20%local STI STI <br /> Pedestrian Bridge* 40.The schools are within walking distance of residential areas,but bicyclists and pedestrians must share the roadway with match or local §136-189.11 §136-189.11 <br /> motor vehicles crossing the existing narrow two(2)-lane bridge that carries Orange Grove Road over 1-40.The bridge is too administration <br /> narrow to accommodate a pedestrian walkway.Lack of an adequate pedestrian crossing presents an unsafe environment for <br /> students to walk to the schools.The Orange County Safe Routes to School Action Plan identifies the pedestrian bridge and <br /> supporting sidewalk improvements as central elements in the plan for Grady Brown Elementary School. <br /> Description:Construct a pedestrian bridge across 1-85 to connect southern Hillsborough neighborhoods with Collins Ridge, <br /> Daniel Boone Village,and Downtown Hillsborough. Not carried <br /> forward by MPO Prohibited by Prohibited by <br /> I-85 Pedestrian Need:Neighborhoods to the south of 1-85,such as those along Cates Creek Parkway and Beckett's Ridge Drive,lack <br /> 19 DCHC Bridge* g g y g NIA STI STI <br /> g pedestrian and bicycle connections to commercial amenities and neighborhoods north of the highway.Constructing a bridge No 20%local §136-189.11 §136-189.11 <br /> across 1-85 would create a safe access point for pedestrians and bicyclists and link areas of Hillsborough south of 1-85 to match or local <br /> Downtown Hillsborough and commercial amenities along Churton Street.Receiving sidewalks will be present on both sides of administration <br /> the proposed pedestrian bridge. <br /> Description:Construct a multi-use path connecting English Hill Lane to Buttonwood Drive. <br /> Not submit to <br /> Trail Connection Need:Project is recommended as an improvement in the Orange County Safe Routes to School Action Plan.An existing NCDOT for P5.0 Prohibited by Prohibited by <br /> from English Hill barrier to pedestrians toward Orange High School and CW Stanford Middle School exists between residential areas along <br /> 20 DCHC Lane to and east of Buttonwood Drive and residential areas along and west of English Hill Lane.The improvement would provide a N/A No 20%local STI STI <br /> Buttonwood Dr.* direct pedestrian connection from highly populated residential areas further west from the schools and make walking match or local §136-189.11 §136-189.11 <br /> distances safer and more manageable. administration. <br /> Description:Construct a multi-use path connecting the southwest comer of Patriots Pointe to Timbers Drive to shorten <br /> walking distances for pedestrians. <br /> Not submit to <br /> Trail Connection NCDOT for P5.0 Prohibited by Prohibited by <br /> from Patriot's Need:Project is recommended as an improvement in the Orange Count Safe Routes to School Action Plan.An existing <br /> 21 DCHC Pointe to Timbers barrier to pedestrians exists between Patriots Point Apartments and Timbers Drive such that long walking distances are N/A No 20%local STI STI <br /> Dr.* required for pedestrians from Patriots Pointe to access the New Grady Brown Elementary School and Cedar Ridge High match or local §136-189.11 §136-189.11 <br /> School along Orange Grove Road with no designated pedestrian facilities.The improvement would provide a direct administration. <br /> pedestrian connection from Patriots Point to Timbers Drive and Orange Grove Road in the direction of the schools that make <br /> walking distances more manageable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.