Browse
Search
Agenda - 02-17-2004-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 02-17-2004
>
Agenda - 02-17-2004-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 9:00:03 AM
Creation date
8/29/2008 10:38:26 AM
Metadata
Fields
Template:
BOCC
Date
2/17/2004
Document Type
Agenda
Agenda Item
9c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br />school #3. The initial phase (Phase I) will have a classroom <br />capacity for 800 students with facilities and facilities <br />capacity generally as detailed on the Moseley Wilkins & Wood <br />CHCCS high school #3 "Phased Project Summary" which is Exhibit A <br />hereto. The funding and construction of the subsequent phase <br />(Phase II) of CHCCS high school #3 is not, except as described <br />here, a part of the INTERLOCAL AGREEMENT or this Addendum. It is <br />anticipated that Phase II will include additional classroom <br />capacity for 400 students, with additional facilities generally <br />as detailed in Exhibit A. In the event there is a smart growth <br />additional appropriation as described in paragraph 4 of this <br />Addendum and paragraph 8 of the INTERLOCAL AGREEMENT, Phase II <br />will be planned, designed and constructed consistent with the <br />smart growth additional appropriation. <br />2. The funding allocation recited in Paragraph 2 of the <br />INTERLOCAL AGREEMENT constitutes the BOARD OF COMMISSIONERS' <br />approval of the amount to be spent for the site as required by <br />N.C. Gen. Stat.. § 1150-426(f); <br />3, The BOARD OF COMMISSIONERS and the BOARD OF EDUCATION <br />are involved in a process designed to result in a list of <br />objective smart-growth principles for CHCCS high school #3 which <br />process is designed to allow construction of the initial phase <br />of CHCCS high school #3 to begin in a timely manner; and <br />i~ <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.