Browse
Search
4.5.23 PB Packet - Final
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
4.5.23 PB Packet - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:09:09 PM
Creation date
4/4/2023 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.5.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
54 <br /> Eden View Trip Generation Build (2024) AM <br /> 1: Dairyland Rd & Glen Eden HCM 6th TWSC <br /> Intersection <br /> Int Delay,s/veh 1.7 <br /> Movement EBL EBT WBT WBR SBL SBR <br /> Lane Configurations *' <br /> Traffic Vol,veh/h 3 56 51 5 15 8 <br /> Future Vol,veh/h 3 56 51 5 15 8 <br /> Conflicting Peds,#/hr 0 0 0 0 0 0 <br /> Sign Control Free Free Free Free Stop Stop <br /> RT Channelized None - None - None <br /> Storage Length - - 0 <br /> Veh in Median Storage,# 0 0 0 <br /> Grade, % 0 0 0 <br /> Peak Hour Factor 90 90 90 90 90 90 <br /> Heavy Vehicles, % 2 2 2 2 2 2 <br /> Mvmt Flow 3 62 57 6 17 9 <br /> Major/Minor Major1 Major2 Minor2 <br /> Conflicting Flow All 63 0 - 0 128 60 <br /> Stage 1 - - - - 60 - <br /> Stage 2 - - 68 - <br /> Critical Hdwy 4.12 - 6.42 6.22 <br /> Critical Hdwy Stg 1 - - 5.42 - <br /> Critical Hdwy Stg 2 - - 5.42 - <br /> Follow-up Hdwy 2.218 - 3.518 3.318 <br /> Pot Cap-1 Maneuver 1540 - 866 1005 <br /> Stage 1 - - 963 - <br /> Stage 2 - - 955 - <br /> Platoon blocked,% - <br /> Mov Cap-1 Maneuver 1540 - 864 1005 <br /> Mov Cap-2 Maneuver - - 864 - <br /> Stage 1 - 961 <br /> Stage 2 - 955 <br /> Approach EB WB SB <br /> HCM Control Delay,s 0.4 0 9.1 <br /> HCM LOS A <br /> Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 <br /> Capacity(veh/h) 1540 - - 908 <br /> HCM Lane V/C Ratio 0.002 - - 0.028 <br /> HCM Control Delay(s) 7.3 0 - 9.1 <br /> HCM Lane LOS A A - A <br /> HCM 95th%tile Q(veh) 0 - - 0.1 <br /> Build(2024)AM.syn VHB <br />
The URL can be used to link to this page
Your browser does not support the video tag.