Browse
Search
4.5.23 PB Packet - Final
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
4.5.23 PB Packet - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:09:09 PM
Creation date
4/4/2023 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.5.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Access and Transportation Network Improvements <br /> The Project is proposing access from Lawrence Road and US 70 Business. The following access <br /> improvements, as recommended in the submitted Transportation Impact Analysis (TIA), have been <br /> proposed: <br /> o US 70 Alt. at Lawrence Road <br /> • Install a traffic signal <br /> • Construct an exclusive northbound left-turn lane with a minimum of 200 feet of storage plus <br /> taper <br /> • Construct an exclusive southbound right-turn lane with a minimum of 100 feet of storage plus <br /> taper <br /> • Construct an exclusive southbound left-turn lane with a minimum of 50 feet of storage plus <br /> taper <br /> o US 70 at Lawrence Road: <br /> • Construct an exclusive northbound left-turn lane with a minimum of 100 feet of storage plus <br /> taper <br /> • Construct an exclusive southbound left-turn lane with a minimum of 200 feet of storage plus <br /> taper <br /> • Adjust signal phasing and timing <br /> o Lawrence Road at Site Driveway 1: <br /> • Construct the full movement Site Driveway 1 with one ingress and two egress lanes <br /> • Construct an exclusive southbound left-turn lane with a minimum of 150 feet of storage plus <br /> taper <br /> o US 70 Alt. at Site Driveway 2: <br /> • Construct the full movement Site Driveway 2 with one ingress and two egress lanes <br /> • Construct an exclusive eastbound right-turn lane with a minimum of 75 feet of storage plus <br /> taper <br /> • Construct an exclusive westbound left-turn lane with a minimum of 150 feet of storage plus <br /> taper <br /> The transportation improvements proposed by the TIA are subject to the NC Department of Transportation <br /> (NCDOT) Municipal School Transportation Assistance ("MSTA") legislation NCGS 136-18 (29a), which <br /> specifies school traffic generation calculations and parameters for reviewing impacts to the local <br /> transportation network ("highway system"). It also requires the NCDOT to reimburse the school for any <br /> transportation improvements to the highway system. <br /> In advance of the Planning Board meeting, the applicant has made the proffer to construct road <br /> improvements, the full details of which can be found in Attachment 1. In summary, the proffer includes <br /> commitments to construct southbound and northbound left-turn lanes on Lawrence Road at the <br /> intersection of Lawrence Road and US 70. This offer to construct would be accompanied by the posting of <br /> a performance bond with NCDOT, of which Orange County would be included as a rider, to guarantee the <br /> construction of the aforementioned turn lanes. Should such construction not be acceptable due to lack of <br /> available right-of-way or disapproval by any necessary regulatory authority, the applicant offers to instead <br /> pay $400,000 to Orange County. Either one of these commitments is offered to be realized prior to <br /> issuance of the Certificate of Occupancy for the charter school. <br />
The URL can be used to link to this page
Your browser does not support the video tag.