Browse
Search
4.5.23 PB Packet - Final
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
4.5.23 PB Packet - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:09:09 PM
Creation date
4/4/2023 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.5.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
238 <br /> Recommended Improvements: <br /> Charter School Improvements <br /> The following improvements are recommended for the projected (2025) build-out traffic <br /> condition based on the capacity analysis presented herein. These improvements are <br /> required solely to accommodate traffic generated by the charter schools: <br /> US 70 Alt. at Lawrence Road <br /> • Install a traffic signal <br /> • Construct an exclusive northbound left-turn lane with a minimum of 200 feet of <br /> storage plus taper <br /> • Construct an exclusive southbound right-turn lane with a minimum of 100 feet of <br /> storage plus taper <br /> • Construct an exclusive southbound left-turn lane with a minimum of 50 feet of <br /> storage plus taper <br /> US 70 at Lawrence Road: <br /> • Construct an exclusive northbound left-turn lane with a minimum of 100 feet of <br /> storage plus taper <br /> • Construct an exclusive southbound left-turn lane with a minimum of 200 feet of <br /> storage plus taper <br /> • Adjust signal phasing and timing <br /> Lawrence Road at Site Driveway 1: <br /> • Construct the full movement Site Driveway 1 with one ingress and two egress <br /> lanes <br /> • Construct an exclusive southbound left-turn lane with a minimum of 150 feet of <br /> storage plus taper <br /> US 70 Alt. at Site Driveway 2: <br /> • Construct the full movement Site Driveway 2 with one ingress and two egress <br /> lanes <br /> • Construct an exclusive eastbound right-turn lane with a minimum of 75 feet of <br /> storage plus taper <br /> • Construct an exclusive westbound left-turn lane with a minimum of 150 feet of <br /> storage plus taper <br /> Recreational Improvements <br /> To accommodate the recreational traffic, which is mainly concentrated in the evenings <br /> after the school traffic has largely dissipated, the internal street system is proposed with <br /> the same laneage. Both Site Driveways 1 and 2 would be built with one ingress and two <br /> egress lanes. It is anticipated that the internal street system would ultimately become <br />
The URL can be used to link to this page
Your browser does not support the video tag.