Browse
Search
4.5.23 PB Packet - Final
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
4.5.23 PB Packet - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:09:09 PM
Creation date
4/4/2023 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.5.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c STATE., 202 <br /> ROY COOPER <br /> Governor u <br /> ELIZABETH S.BISER <br /> Secretary *EBf QUAM <br /> MICHAEL SCOTT NORTH CAROLINA <br /> Director Environmental Quality <br /> DATE: February 20, 2023 <br /> TO: Michael Scott, Division Director through Sharon Brinkley <br /> FROM: Deb Ajar Western District Supervisor-Solid Waste Section Field Operations Branch <br /> RE: NEPA Project 23-0163, Orange, NC <br /> Orange County - Eden View Subdivision <br /> The Solid Waste Section has reviewed the Orange County Planning and Zoning Environmental <br /> Assessment document for the construction of Eden View Subdivision to create 39 single-family lots <br /> on approximately 192 acres located east of Orange Grove Road and north of Dairyland Road in <br /> Orange County, North Carolina. Should any structures be proposed to be demolished as part of this <br /> project lead, asbestos or other contaminants may be present and must be managed appropriately. <br /> Otherwise, the review has been completed and has found no adverse impact on the surrounding <br /> community and likewise knows of no situations in the community, which would affect this project <br /> from a solid waste perspective. <br /> During the project, every feasible effort should be made to minimize the generation of waste, to <br /> recycle materials for which viable markets exist, and to use recycled products and materials in the <br /> development of this project where suitable. Any waste generated by this project that cannot be <br /> beneficially reused or recycled must be disposed of at a solid waste management facility approved <br /> to manage the respective waste type. The Section strongly recommends that any contractors are <br /> required to provide proof of proper disposal for all waste generated as part of the project. A list of <br /> permitted solid waste management facilities is available on the Solid Waste Section portal site at: <br /> https://deg.nc. ov/about/divisions/waste-management/solid-waste-section/solid-waste-permitted- <br /> facility-information-and-guidance/solid-waste-facility-lists <br /> Please contact Chuck Kirchner, Environmental Senior Specialist, for any questions regarding solid <br /> waste management for this project. Mr. Kirchner can be reached at (336) 776-9633 or by email at <br /> chuck.kirchner@ncdenr.gov. <br /> Ec: Jason Watkins, Field Operations Branch Head <br /> Chuck Kirchner, Environmental Senior Specialist <br /> D E Q�� North Carolina Department of Environmental Quality I Division of Waste Management <br /> Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 <br /> NORTH CAROLINA _ <br /> Department m Environmental Quality /`� 828.296.4500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.