Browse
Search
4.5.23 PB Packet - Final
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
4.5.23 PB Packet - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:09:09 PM
Creation date
4/4/2023 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.5.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
192 <br /> Tyler Sliger <br /> From: Jones, DeAngelo J <djjones1 @ncdot.gov> <br /> Sent: Tuesday, March 14, 2023 10:13 AM <br /> To: Tyler Sliger <br /> Cc: Chuck Edwards Contact <br /> Subject: RE: [External] Memo for MA22-0006 (Edenview) <br /> Hello Tyler <br /> Please find comments from my review of Edenview. <br /> Permitting <br /> • An NCDOT Driveway Permit submittal is required to be uploaded to the portal. <br /> • An NCDOT Subdivision Minimum Construction Standards Review submitted as hard copy to the District Office is <br /> required. <br /> Traffic <br /> Edenview is a proposed 38 lot subdivision with primary access on SR 1177, Dairyland Road.The 38 lots will not generate <br /> enough trips to meet the NCDOT threshold to require a traffic study. Using the Average Daily Trips information provided <br /> by NCDOT, Dairyland Road is a low volume roadway. Using this information, I have the following comments: <br /> • Will Orange County be requiring a traffic study? <br /> • Please mark the proposed driveway location in the field for further investigation. <br /> General Plan Review <br /> • Please provide additional design detail at the driveway connection. <br /> • Please provide additional roadway design detail of internal network such as horizontal curve data, roadway <br /> lengths, centerline profiles with vertical curve data etcetera. <br /> • You will need to provide stormwater and drainage calculations. <br /> • Provide additional information of waterway crossings such as pipe sizes and material <br /> o Please note pipe sizes 48" and larger will be required to be reviewed by the Hydraulics and Geotechnical <br /> Units. <br /> • Does roadway width meet Fire Code? <br /> • To meet eligibility for road addition to the State maintenance system, please verify that there are 2 proposed <br /> homes per tenth of mile. <br /> • There must be a minimum of 2 homes accessing the cul-de-sacs. <br /> If you have any additional questions, please feel free to reach out to me using information provided below. <br /> Regards <br /> DeAngelo J. Jones <br /> Senior Assistant District Engineer <br /> North Carolina Department of Transportation <br /> Division of Highways <br /> Division 7, District 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.