Browse
Search
4.5.23 PB Packet - Final
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
4.5.23 PB Packet - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:09:09 PM
Creation date
4/4/2023 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.5.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
156 <br /> 2. Proposed support facilities (i.e. roadways and access points, parking, pedestrian and vehicular <br /> circulation systems, screening and buffer areas, etc.) and/or <br /> 3. All other matters the County may find appropriate or the petitioner may propose. <br /> The following voluntary conditions are being offered by the applicant: <br /> 1. Application: Project shall be completed as presented in approved site plan/application packet, <br /> including all open space and recreation dedications and offered construction and grading <br /> requirements. Applications to rezone property to a Conditional District shall be processed in <br /> accordance with the procedures in LIDO Section 2.9. <br /> Review Milestones <br /> Application Submittal Date December 8, 2022 <br /> Development Advisory Committee December 15, 2022, and March 2, <br /> (DAC) Review 2023 <br /> Neighborhood Information Meeting March 22, 2023 <br /> (NIM) <br /> Note: the DAC is a staff/agency committee, established in Section 1.9 of the Unified <br /> Development Ordinance. <br /> Courtesy Review <br /> Jurisdiction Date Sent Comments Received (Y/N) <br /> None Required <br /> Analysis <br /> Staff Analysis <br /> As required under Section 2.8.5 of the UDO, the Planning Director shall cause an analysis to be made <br /> of the application. In analyzing this request, the Planning Director offers the following: <br /> 1. The application is complete in accordance with the requirements of Section 2.9.1 (C) of the UDO; <br /> 2. The proposal is consistent with the 2030 Comprehensive Plan, furthering the following goals: <br /> a. Land Use Overarching Goal: Coordination of the amount, location, pattern, and designation <br /> of future land uses, with availability of County services and facilities sufficient to meet the <br />
The URL can be used to link to this page
Your browser does not support the video tag.