Browse
Search
4.5.23 PB Packet - Final
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
4.5.23 PB Packet - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:09:09 PM
Creation date
4/4/2023 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
4/5/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
4.5.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Utilities <br /> The property is not in an area served by public water/sewer. Water and wastewater services will be <br /> provided via a private well and septic system that meet Orange County Environmental Health standards <br /> (see Attachment 5.4). <br /> Erosion Control/Stormwater Regulations <br /> The applicant has indicated the project will conform to existing stormwater management (Section 6.14) and <br /> erosion and sedimentation control (Section 6.15) regulations of the UDO. See attachment 5.3. Based on <br /> staff review the most current preliminary submittal, the project can meet applicable stormwater <br /> management requirements for the Jordan Lake basin watershed as defined in UDO Section 6.14.8(B). <br /> Land Use Buffers/Setbacks <br /> North 100' Type F Buffer/ 30' from front, 15' from side and rear Setback <br /> South 100' Type F Buffer/ 30' from front, 15' from side and rear Setback <br /> East 100' Type F Buffer/ 30' from front, 15' from side and rear Setback <br /> West 100' Type F Buffer/ 30' from front, 15' from side and rear Setback <br /> Environmental Assessment (EA) <br /> The applicant has provided an Environmental Assessment (EA) application and supporting materials as <br /> required in Section 6.16 of the UDO with their submittal. These materials were shared with various State <br /> agencies via the NC Department of Administration's State Clearinghouse on February 9t" (Attachment <br /> 5.9). Planning and DEAPR Staff have jointly reviewed the materials and agree with a determination of <br /> "Finding of No Significant Impact (FONSI)" as required in Section 2.25.1 (B) (5) of the UDO <br /> (Attachment 5.2). This determination eliminates a requirement from the applicant to provide a more <br /> detailed Environmental Impact Statement (EIS) process as outlined in Sections 2.25.2 and 6.16.4 of the <br /> UDO. <br /> Solid Waste <br /> The applicant has indicated development within the project will conform to the Orange County Solid <br /> Waste Management Ordinance. OC Solid Waste requires a "Will-Serve" letter from the private hauler <br /> that will be servicing the site to confirm that based on the latest set of plans said private hauler can and <br /> will provide recycling collection that at a minimum meets OC Solid requirements for recyclable materials <br /> collected (Attachment 5.6). <br /> Proposed Conditions <br /> Per NCGS 160D-703, imposed conditions and site-specific standards are limited to those that address <br /> conformance of the development and use of the site to local government ordinances and adopted plans <br /> or the impacts reasonably expected to be generated by the development or use of the site. Per Section <br /> 2.9.1 (F) (3) of the UDO, mutually agreed upon conditions can be imposed as part this process only if <br /> they address: <br /> 1. The compatibility of the proposed development with surrounding property, <br />
The URL can be used to link to this page
Your browser does not support the video tag.