Browse
Search
Agenda - 05-06-2002 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 05-06-2002
>
Agenda - 05-06-2002 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 3:33:38 PM
Creation date
8/29/2008 10:38:25 AM
Metadata
Fields
Template:
BOCC
Date
5/6/2002
Meeting Type
Municipalities
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20020506
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) Orange Grove Road <br /> Orange Grave Road (SR 1006) is rated as a major thoroughfare in the adopted Hilllsborough <br /> Thoroughfare Plan (adopted by the Town of Hillsborough on July 23, 1996 and the NCDOT on <br /> October 4, 1996). This roadway also includes a joint pedestrian/bicycla route. Orange Grove <br /> Road is functionally noted as a minor arterial,(Hillsborough area)and collector(Orange County <br /> coral area)in Orange Coun6Js Comprehensive Plan. <br /> The potential for traffic growth in this corridor is being realized by various projects in process <br /> and progress in both Hillsborough and Orange County. To ameliorate substantiated present <br /> and future traffic congestion,traffic planning is paramount in development permit decisions. <br /> Approaches to reduce diminished traffic levels of service include: <br /> • Dedication of appropriate right of way(80"wide)for a planned readwaycross. <br /> section by developers during proposal review. <br /> • Construction of additional lanes, Including a third lane, fight and left turn lanes, by <br /> the developer and/or with coordination with NCDOT and the Town of Hillsborough. <br /> • Alignment of intersections as noted in the Town Of Hillsborough (Thoroughfare Plan) <br /> such as Eno Mountain Road and Mayo Street,which then could potentially warrant a <br /> traffic light as well as promote the only other north —south alternative acmes the Eno <br /> River. <br /> • installation of traffic lights. <br /> • Pedestrian and bikeways to ensure safety of the non-motoring public. <br /> These approaches and orhers are common and meet Me objectives of providing for orderly <br /> development with lower overall casts to the public as well as enable private Interests b plan their <br /> actions, improvements,and development w0h the knowledge of public interests. <br /> b) Intarmadion of US TO I NO 061 NC57 <br /> The intersection of US 70/ NO 86 and NO 86/NC57 and the NO 86 link between the <br /> intersections, are approaching inadequate levels of service (LOS). Approved development and <br /> natural increases in traffic volume will, In a short pert overburden these areas. Even though <br /> some improvements to the US 7O I NO 86 intersection and NO 86 madway north to the future <br /> northern loop were requested an the local TIP priority list, the project typically does not <br /> maMCOlate is the regional priority list In a shaft dare faced, which could extend such a project <br /> schedule to five or more years. Other creative methods to begin planning for these roadway <br /> constructon Improvements, should be considered. <br /> FINANCIAL IMPACT: There Is no financial impact associated with discussion of these issues. <br /> RECOMMENDATION(Sh The Manager recommends that the Besot discuss these issues and <br /> condoms and provitle any necessary comments to staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.