Orange County NC Website
70 <br />The following table chronicles FCC 1205 equipment and installation rates since 2001. Beginning <br />in 2002, Time Warner's rates are based on nationally aggregated financial and operational <br />infornation. <br />FCC1205 2001 <br />regional 2002 <br />national 2003 <br />national 2004 <br />national Delta <br />Remote Control 30 28 $0.35 50.35 50 34 5-0.01 <br />Addressable 1 54 26 58 49 57..34 57 99 50 GS <br />Non-addressable 2 50.93 50 G8 $0.59 50 68 $0 09 <br />Time Warner aggregated its equipment and installation expenses on a national basis to establish a <br />uniform rate struehue in its 3000 fi~anehises. hr addition to equipment rentals, a variety of <br />installation services are tied to the HSC rate. The next table lists the differences in the amount of <br />time required to install cable service since 2001. The 2001 installation average installation times <br />represent North Carolina "regional" values where as the later years reflect Company-wide <br />aggregated measurements. <br />Average Hours* per 2001 2002 ?003 2004 Delta <br />Installation FCC1205 FCC1205 FCC1205 FCC1205 +/- change <br /> NC regional company company company <br />Average Flours per Umvired 0.96 120 122 126 0 04 4 17% <br />Home Installation <br />Average Flours per Pre-wired 0 84 0 85 0 85 0 8R 0.03 3 5T% <br />(-lone histallation <br />Average ]-lours per 0.55 0 54 0 53 0.50 -0 03 -5 45% <br />Additional Comtcction at <br />time of Instnllation <br />Average ]{ours per 0 73 0.85 0.84 0.88 0 04 5 48%" <br />Additional Connection <br />Requiring Separate <br />lnstallation <br />*time in hours is expressed as decimal equivalents <br />Time Warner did not provide documentation to support the basis for Total Maintenance Hours <br />(Schedule C(B)), the average time required to wire a home (Schedule D(A)), time required to <br />complete a "pre-wire" (Schedule D(B), extra average time required to install an additional outlet <br />simultaneously with a primary installation (Schedule D(C), average time required to install an <br />additional outlet subsequent to the primacy installation (Schedule D(D)), average time to perform <br />a hard disconnection (Schedule D(E), average time to perform a tier change, and the average time <br />to perform an "aparhnent"installation (Schedule D(F)} <br />Action Audits, LLC Cable Rate, Franchise Fee, Utility lax Auditing & Telecommunication Administration <br />101 Pocono Lame, Cnry, North Carolina 27513-5316 Voice Il 919 A67.5392 Fax it 919 460 6868 <br />