Browse
Search
Agenda - 04-04-2023; 5-b - Application for Zoning Atlas Amendment – Parcel Located at 3026 White Cross Road, Chapel Hill, in Bingham Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 04-04-2023 Business Meeting
>
Agenda - 04-04-2023; 5-b - Application for Zoning Atlas Amendment – Parcel Located at 3026 White Cross Road, Chapel Hill, in Bingham Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:12:34 PM
Creation date
3/30/2023 12:17:09 PM
Metadata
Fields
Template:
BOCC
Date
4/4/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for April 4, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 04-04-2023 Business Meeting
OTHER-2023-021-Expansion of Duke Energy Utility Easement at Gravely Hill Middle School
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
OTHER-2023-022-Approval of financing arrangements for Efland volunteer fire department for renovation of fire station 1
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
PRO-2023-003-Public Safety Telecommunicators Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
PRO-2023-004-Native Plant Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2023
RES-2023-023-Refund-Release Resolution-Approval
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-024-Refund-Release Resolution-Approval
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-025-Exemption-Exclusion Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-026-Proposed Sale of 0.45 Acre Property, PIN #0900832203, Hillsborough
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-027-Resolution Supporting Legislation to Reclassify Telecommunicators
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-028-Approval of in county travel allowance for Orange County schools board of education members
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
131 <br /> Erosion and Sedimentation Control: <br /> According to current Orange County GIS imagery of the project parcel, there are no <br /> mapped stream features or other water features within the project parcel boundaries. <br /> Orange County enforces stream buffers along streams, rivers, water bodies, and other <br /> water features (e.g. wetlands) as outlined in Section 6.13 of the Orange County UDO. <br /> Based on the submitted materials for the proposed development, the project could meet <br /> the basic Erosion and Sedimentation Control requirements as outlined in Section 6.15 of <br /> the Orange County UDO and could be developed as generally proposed. <br /> Stormwater Management: <br /> The project parcel is located in the Haw River Unprotected Watershed Overlay District, <br /> and is therefore subject to compliance with the Jordan Lake Nutrient Management <br /> Strategy. There are no known Special Flood Hazard Areas (SFHAs) located on the <br /> project parcel. Based on the submitted materials for the proposed development, the <br /> project could meet the basic Stormwater Management requirements as outlined in <br /> Section 6.14 of the Orange County UDO. The project proposes the installation of one (1) <br /> permanent primary Stormwater Control Measure (SCM) to meet water quantity <br /> requirements (i.e. post-development stormwater runoff attenuation). There are no water <br /> quality requirements (i.e. post-development nutrient attenuation) currently associated <br /> with the Watershed Overlay District within which the project parcel is located. The primary <br /> SCM is currently identified as an engineered Stormwater Wetland. The Site Plan, while <br /> preliminary at this stage of Orange County review, meets applicable stormwater <br /> management requirements as outlined in Section 6.14 of the Orange County UDO and is <br /> in general conformance with the North Carolina Stormwater Design Manual (i.e. Minimum <br /> Design Criteria). <br /> Conclusion: <br /> The Division has No Objections to the approval of the rezoning request so long as a <br /> complete LDP application and supporting plans and calculations are submitted to Orange <br /> County for review, processing and approval prior to commencement of on-site Land- <br /> Disturbing Activity. As the project progresses with engineering design, additional field <br /> observations, and/or permitting by others (e.g. US Army Corps of Engineers, NC <br /> Department of Environmental Quality, NC Department of Transportation, etc.), additional <br /> buffers, setbacks, and/or additional Orange County review and permitting may apply <br /> beyond the proposed development as shown with this rezoning request. <br /> /yam 02./09 /2023 <br /> Christopher Sandt, PE Date <br /> - /C;�'/20 z3 <br /> Steve Kaltenbach Date <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.