ORANGE COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: February 17, 2004 <br />Action Agen a <br />Item No. -Gt <br />SUBJECT: Site Plan -Efland Cheeks Park (Phase II) <br />DEPARTMENT: ERCD,R&P <br />PUBLIC HEARING: (YIN) No <br />ATTACHMENT INFORMATION CONTACT: <br />1) Draft Site Plan Map David Stancil, 245-2590 <br />Lori Taft, 245-2660 <br />Paul Thames, 245-2303 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 968-4501 <br />Durham 688-7331 <br />Mebane 336-227-2031 <br />PURPOSE: To approve the submittal of a site plan for Phase II of Efland Cheeks Park. <br />BACKGROUND: On December 9, 2003, the Board received the report of the Efland Cheeks <br />Park Concept Plan Review Committee, and authorized staff to develop a proposed site plan <br />for the construction of Phase II of this park, co-located with Efland-Cheeks Elementary <br />School in western Orange County. <br />The attached site plan has been developed based on the report and Board feedback on <br />December 9. The primary features of Phase II of the park are a new picnic shelter, lighting <br />around the existing playing field and walking track, and trails (bath a smaller ADA-accessible <br />trail from the Community Center and a longer natural surface loop trail that would connect to <br />adjacent Richmond Hills subdivision). The existing playground equipment would also be <br />relocated. As instructed on December 9, a separate possible add-on to the project pending <br />discussion with the Orange County Schools, is the grading and seeding of the "northern field" <br />located above the school, would be included in the construction bid materials for pricing and <br />later consideration of addition. Staff would also develop a plan for addressing the former <br />sedimentation basin on the property. <br />After review and approval of the site plan, construction bid documents and construction <br />drawings will be developed. These activities would not occur until after the County has hired <br />a Construction Manager, A timetable for park construction will be presented at that time. <br />Generally, it is estimated that construction bids/drawing preparation, the award of the bid and <br />actual construction could be accomplished in approximately 8-10 months after the site plan is <br />approved. <br />