Browse
Search
Agenda - 04-04-2023; 5-b - Application for Zoning Atlas Amendment – Parcel Located at 3026 White Cross Road, Chapel Hill, in Bingham Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 04-04-2023 Business Meeting
>
Agenda - 04-04-2023; 5-b - Application for Zoning Atlas Amendment – Parcel Located at 3026 White Cross Road, Chapel Hill, in Bingham Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:12:34 PM
Creation date
3/30/2023 11:56:00 AM
Metadata
Fields
Template:
BOCC
Date
4/4/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for April 4, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 04-04-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
147 <br /> r'"ejo-ei a T" <br /> Civil Engineer— Consulting Engineer— Land Development <br /> PO Box 4580 <br /> Emerald Isle, NC 28594 <br /> (252) 777-0141 + athan.parker@ampdengineering.com <br /> Firm License Number P-1532 <br /> Ref: AMP'D Engineering, PLLC Septic Standards <br /> To Whom It May Concern, <br /> Due to unforeseen negligence by previous owners and contractors regarding the Engineered <br /> Option Permit ("EOP") process and installation, the following standards have been adopted by <br /> AMP'D Engineering, PLLC and are to be strictly followed. If these standards are not followed, <br /> AMP'D Engineering, PLLC has the right to void all warranties related to engineering work <br /> involved with these EOPs. <br /> • Engineer shall approve septic installer prior to installation. <br /> • Engineer shall be notified at a minimum of 48 hours prior to septic installation. <br /> • No vehicles, equipment, structures, debris, or any other items that may compact the soils <br /> or damage the septic lines allowed on the septic location before or after installation. <br /> Equipment only allowed over the septic area by a certified septic installer to backfill and <br /> grade the septic area after installation. <br /> • All systems are to have a minimum of 6" cover over the system and five feet beyond the <br /> system. Only approved soil to be used as cover. <br /> • After installation, the area should be graded to shed water. All drainage should be <br /> diverted away from septic area and tanks. <br /> • All drip systems to have a minimum of 12" cover over the system and five feet beyond <br /> the system. Only group I soil allowed over system with a cap of topsoil to promote <br /> growth of groundcover. <br /> • Groundcover is to be established over every system within 14 days after installation. <br /> • Orange safety fencing with T-Posts to be used to surround the system after installation to <br /> prevent any unqualified individuals from entering septic area. <br /> If you have any questions, please feel free to give me a call (252) 777-0141 or email me <br /> (athan.parker@ampd en gineering.com). <br /> Sincerely, <br /> �( :''+4�� CARO <br /> -_IMEER.oE. s.o_AMPo OssiQ %, <br /> o„e,ozz12S1WE=gAMM <br /> o=oo �. <br /> SEAL <br /> Athan M Parker, PE = 43250 = <br /> President <br /> AMP'd Engineering, PLLC <br /> Firm License No. P-1532 <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.