Browse
Search
2023-136-E-AMS-Progressive Design Collaborative-Professional Design Services for the Whitted Building A & B HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-136-E-AMS-Progressive Design Collaborative-Professional Design Services for the Whitted Building A & B HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2023 3:43:29 PM
Creation date
3/28/2023 3:43:09 PM
Metadata
Fields
Template:
Contract
Date
3/27/2023
Contract Starting Date
3/27/2023
Contract Ending Date
3/28/2023
Contract Document Type
Contract
Amount
$130,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />• Fee: $130,000 <br />• Bid Documents complete: June 2023 <br />• Construction: June 2024 – December 2024 <br /> <br />Piedmont Food Processing Center: <br />• Replace 8 packaged units and 2 split systems <br />• Budget: $325,000 + $25,000 contingency <br />• Fee: $30,000 <br />• Bid Documents complete: April 2023 <br />• Construction: November 2023 <br /> <br />West Campus Office Building: <br />• Add in-row cooling for data rack <br />• Budget: $30,000 + $5,000 contingency <br />• Fee: $6,000 <br />• Bid Documents complete: March 2023 <br />• Construction: March 2024 <br /> <br />Passmore Senior Center: <br />• Replace 5 RTU gas packs <br />• Replace three exhaust fans <br />• Replace on ductless split system <br />• New DDC for the new equipment <br />• Budget: $400,000 + $50,000 contingency <br />• Fee: $35,000 <br />• Bid Documents complete: April 2023 <br />• Construction: March 2024 <br /> <br />Hockey Building: <br />• Replace fluid cooler <br />• Replace rink RTU <br />• Budget: $700,000 + $50,000 contingency <br />• Fee: $55,000 <br />• Bid Documents complete: May 2023 <br />• Construction: May 2024 <br /> <br /> <br />I am proposing the following services: <br />• Site visits as required to complete the design <br />• Submit plans to owner and address comments as needed <br />• Construction drawing phase with specifications suitable for a formal/informal public bid <br />• Conduct pre-bid and provide addendum as needed <br />• Receive bids, certify bid tabulation, and provide a letter of recommendation <br />• Conduct a preconstruction conference <br />• Review shop drawings and address RFI’s as needed <br />• Review pay applications and provide a recommendation letter <br />• Site visits during construction activities as required <br />• As-built drawings in pdf and hard copy <br /> <br /> <br />Exclusions: <br />1. Equipment beyond the list above <br />2. Hazardous material testing or abatement services <br />3. Commissioning <br />DocuSign Envelope ID: 3D4D20DD-E384-4780-B168-B7B2CCA4B00B
The URL can be used to link to this page
Your browser does not support the video tag.