Browse
Search
2023-136-E-AMS-Progressive Design Collaborative-Professional Design Services for the Whitted Building A & B HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-136-E-AMS-Progressive Design Collaborative-Professional Design Services for the Whitted Building A & B HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2023 3:43:29 PM
Creation date
3/28/2023 3:43:09 PM
Metadata
Fields
Template:
Contract
Date
3/27/2023
Contract Starting Date
3/27/2023
Contract Ending Date
3/28/2023
Contract Document Type
Contract
Amount
$130,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />Revised 06/21 <br /> <br />Item on Form Definition <br /> <br />CURRENT ESTIMATED CONSTRUCTION COST <br />Attach basis and justification for estimate. Include description, quantities, units, <br />special features, similar cost on recent projects, etc. <br /> <br />A. 1. Demolition <br /> <br />Includes but may not be limited to lead or asbestos testing and removal, building or <br />interior space demolition in whole or part. <br /> <br />A. 2. Site Work <br /> <br />Includes but may not be limited to grading, excavating, poor soils or rock removal, <br />utilities relocation, roads, walks, parking, streambank repairs, stormwater <br />management, retaining walls, rainwater harvesting systems, landscaping. <br /> <br />B. 1. Utility Services <br /> <br />Attach explanation of any special building, mechanical, or electrical service <br />requirements with appropriate distance to existing buildings, water, gas, electrical or <br />other utility service. <br /> <br />B. 9. Associated Construction Costs <br /> <br />Includes but may not be limited to construction fire alarm testing, utility shut downs, <br />utilities, signage, security, displaced parking, staging, lock cores, keys, permits. <br /> <br />B. 10. Other <br /> <br />List other signficant sources of cost not included elsewhere. Additional lines may be <br />added if needed. <br /> <br />PRECONSTRUCTION <br />COSTS <br /> <br />Includes but may not be limited to land surveys, lead/asbestos surveys, <br />environmental assessments, copying, postage, costs of print advertising, and <br />destructive testing. For CM at Risk, preconstruction costs are consistent with the <br />requirements of the preconstruction services agreement. <br /> <br />CONTINGENCIES <br /> <br />Unanticipated or unforseen conditions including but not limited to design error and <br />omissions, concealed site conditions, utility conflicts, and extended overhead <br />resulting from weather or other delay. <br /> <br />DocuSign Envelope ID: 3D4D20DD-E384-4780-B168-B7B2CCA4B00B
The URL can be used to link to this page
Your browser does not support the video tag.