Orange County NC Website
<br />(Construction Costs) <br />Up to $500 $200 <br />From $501 to $12,000 <br /> <br />$200 + 10% of the Hard Costs Not to Exceed <br />$1,000 plus 10% up to $1,000 in admin of <br />the total of hard and soft costs combined. <br /> <br /> <br /> <br /> <br />ESFR 2020 HARD COSTS <br />(Construction Cost) <br />MAXIMUM PROGRAM SUPPORT <br />(Administration Cost) <br />Up to $30,000 $4,850 in NCHFA soft cost funding <br />DocuSign Envelope ID: 841B45B4-F0FD-4C4B-9ADC-EFD3081A70F3