Browse
Search
2023-124-E-OCTS-NetPlanner Systems-Change order 7 to outside plant fiber Optic Infrastructure per REP367 OC5301
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-124-E-OCTS-NetPlanner Systems-Change order 7 to outside plant fiber Optic Infrastructure per REP367 OC5301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 2:33:36 PM
Creation date
3/16/2023 2:33:24 PM
Metadata
Fields
Template:
Contract
Date
3/15/2023
Contract Starting Date
3/15/2023
Contract Ending Date
3/15/2023
Contract Document Type
Contract
Amount
$10,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1229 Perry Road, Suite 109 <br />Apex, NC 27502 <br />Direct: (919) 290-8011 <br />Cell: (770) 833-7643 <br />andrew.rakestraw@netplanner.com <br /> <br /> <br />Atlanta, GA ● Augusta, GA ● Columbus, GA ● Savannah, GA ● Raleigh, NC <br /> <br />Corporate Headquarters: <br />3145 Northwoods Parkway, Suite 800 ● Norcross, GA 30071 <br />Office: (770) 662-5482 ● Fax: (770) 441-3773 ● Toll-Free: (800) 795-1975 <br /> <br />www.netplanner.com <br /> <br /> <br />PAYMENTS <br />NetPlanner Systems, Inc. will invoice Customer for all materials and for mobilization upon approval of proposal. <br />Customer will be invoiced for labor at the end of the project or at the end of the month, whichever comes first, based <br />upon the percentage of the project completed. The Customer agrees to pay any and all payments according to the <br />payment schedule. Should said payment(s) not be made, or if satisfactory arrangements for payment have not been <br />made, NetPlanner Systems, Inc. reserves the right to stop all work until such time as payment is rendered or <br />satisfactory payment arrangements have been made. Standard payment terms are NET 15. <br />Any required closeout documents, including, but not limited to, as-built drawings, test results, and warranties, will be <br />released to the Customer once 90% of the total project payment has been received by NetPlanner Systems, Inc. <br />NetPlanner Systems, Inc. operates primarily as a contractor for sales tax purposes. This means that all sales tax is paid <br />to the Department of Revenue at the point of purchase of materials and that no sales tax may be charged to <br />NetPlanner Systems, Inc. customers. <br />INCLUSIONS <br />Pricing includes above described items by NetPlanner Systems, Inc. and applies to regular business hours unless <br />otherwise stated, Monday -Friday 7:30 AM - 4:30 PM. <br />This bid proposal and the pricing within is valid for 90 days, however materials may not be purchased until jobsite is <br />ready for low voltage scope to begin. If the metal market experiences any volatility during this time, pricing may be <br />adjusted to compensate for difference." <br />EXCLUSIONS <br />Overtime labor is not included in this proposal. <br />NetPlanner Systems is not responsible for conduit, millwork, or other general construction requirements that provide <br />pathways to provided equipment. This also includes any ceiling reconstruction, i.e. ceiling tile/grid, sheetrock, etc. <br />NetPlanner Systems is not responsible for any configuration of Customer’s network equipment that may impede the <br />completion of the project. <br />DocuSign Envelope ID: D84862E2-2392-4DF6-A303-B7799FD027EB
The URL can be used to link to this page
Your browser does not support the video tag.