Browse
Search
2023-124-E-OCTS-NetPlanner Systems-Change order 7 to outside plant fiber Optic Infrastructure per REP367 OC5301
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-124-E-OCTS-NetPlanner Systems-Change order 7 to outside plant fiber Optic Infrastructure per REP367 OC5301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 2:33:36 PM
Creation date
3/16/2023 2:33:24 PM
Metadata
Fields
Template:
Contract
Date
3/15/2023
Contract Starting Date
3/15/2023
Contract Ending Date
3/15/2023
Contract Document Type
Contract
Amount
$10,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1229 Perry Road, Suite 109 <br />Apex, NC 27502 <br />Direct: (919) 290-8011 <br />Cell: (770) 833-7643 <br />andrew.rakestraw@netplanner.com <br /> <br /> <br />Atlanta, GA ● Augusta, GA ● Columbus, GA ● Savannah, GA ● Raleigh, NC <br /> <br />Corporate Headquarters: <br />3145 Northwoods Parkway, Suite 800 ● Norcross, GA 30071 <br />Office: (770) 662-5482 ● Fax: (770) 441-3773 ● Toll-Free: (800) 795-1975 <br /> <br />www.netplanner.com <br /> <br />within the RFP/bid documents as a requirement. If a contract is awarded and later determined to be a Davis <br />Bacon/Davis Bacon Related Act project, NetPlanner Systems, Inc. will issue a change order for the additional labor <br />costs and/or have the right to cancel the contract based upon the contractor's failure to properly notify bidders of the <br />Prevailing Wage requirements. In some instances, the Prevailing Wage Determination provided within an RFP/bid <br />package does not include an employee classification matching the specialized skills required of our employees. Under <br />these circumstances, our quote is based upon the prevailing wage rates for our classification, in the project's specific <br />geographic location. In addition, should the contract be awarded to our company, we would need to submit an SF1444 <br />requesting a wage conformance to include a worker classification for Telecommunications / Voice / Data / Video <br />technicians. <br />FEDERAL SUBCONTRACTOR STATUS <br />If applicable, the parties hereby incorporate the requirements of 41 CFR §§60 1.4 (a) (7), and 29 CFR Part 471, <br />Appendix A to Subpart A. <br />If applicable, this contractor and subcontractor shall also abide by the requirements of 41 CFR § 60 300.5 (a) and 41 <br />CFR § 60 741.5 (a). These regulations prohibit discrimination against qualified protected veterans and qualified <br />individuals on the basis of disability, and requires affirmative action by covered prime contractors and subcontractors <br />to employ and advance in employment qualified protected veterans and individuals with disabilities. <br />BUILDING CODES <br />All work performed under this agreement shall comply with applicable building codes. Any additional work required by <br />the Building Department beyond the agreement of this contract is not the responsibility of NetPlanner Systems, Inc. <br />Terms and Conditions Proprietary and Confidential NetPlanner Systems, Inc. <br />ASBESTOS AND OTHER HAZARDOUS MATERIALS <br /> It is the obligation of the Customer to determine if the structure covered by this contract contains asbestos and/or <br />other hazardous materials. This proposal and contract does not include any provision (neither monetary provisions nor <br />time-schedule provisions) to cover the unforeseen hazards or additional work necessitated by removal of asbestos <br />and/or other hazardous materials. If asbestos and/or other hazardous materials are discovered after work is already in <br />progress, and if the asbestos and/or other hazardous materials represent a changed condition from those described in <br />the plans and specifications, then NetPlanner Systems, Inc. shall be entitled to additional compensation and an <br />increase in time for completion of the project. <br />DocuSign Envelope ID: D84862E2-2392-4DF6-A303-B7799FD027EB
The URL can be used to link to this page
Your browser does not support the video tag.