Browse
Search
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 03-21-2023 Business Meeting
>
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 1:13:31 PM
Creation date
3/16/2023 1:20:54 PM
Metadata
Fields
Template:
BOCC
Date
3/21/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-d
Document Relationships
Agenda for March 21, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
Minutes-03-21-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-019 Professional Services Contract for Whitted Buildings HVAC Replacement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> 6.1.3 Should the Owner determine that the Designer is behind schedule, it may require the Designer to expedite and accelerate its <br /> efforts, including providing additional manpower or overtime, as necessary, to perform its services in accordance with the Key Milestone <br /> Listing at no additional cost to the Owner. <br /> 6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully <br /> executed original of this Agreement. <br /> 6.2 Adjustments to the Schedule <br /> 6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty(60) days through no fault of the Designer, or if the <br /> Owner increases or decreases the scope or size of the Project by ten percent (10%) of currently estimated Total Project Cost,the <br /> Designer shall give prompt written notice to the Owner. Provided that such notice has been given,the Designer may request in writing <br /> an adjustment in the Key Milestone Listing dates, which shall be granted by the Owner to the extent reasonable. <br /> ARTICLE 7 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this <br /> Agreement. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> Not-to-exceed Compensation for Basic Services consists of the following compensation for the following separate categories of services: <br /> 7.2.1 Schematic Design Phase. Lump Sum (Insert Lump Sum or Time and Materials as appropriate)fee of 0. <br /> 7.2.2 Design Development Phase. Lump Sum fee of 0. <br /> 7.2.3 Construction Document Phase. Lump sum fee of 91,000.00. <br /> 7.2.4 Bidding and Contract Award. Lump sum fee of$6,500.00. <br /> 7.2.5 Construction Phase. Lump sum fee of$26,000.00. <br /> 7.2.6 Post Construction Phase. Lump sum fee of$6,500.00. <br /> 7.2.7 Additional Basic Services (Select all that apply): <br /> fee of <br /> fee of <br /> fee of <br /> fee of <br /> 7 <br /> Revised 06/21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.