Browse
Search
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 03-21-2023 Business Meeting
>
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 1:13:31 PM
Creation date
3/16/2023 1:20:54 PM
Metadata
Fields
Template:
BOCC
Date
3/21/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-d
Document Relationships
Agenda for March 21, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 03-21-2023 Business Meeting
Minutes-03-21-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-019 Professional Services Contract for Whitted Buildings HVAC Replacement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> 4.1.1 The Designer shall perform as Basic Services the work and services described herein and in Attachment B to this Agreement. <br /> 4.1.2 The Basic Services will be performed by the Designer in the phases described in Attachment B. <br /> 4.1.3 The Owner shall have the right and option to require the Designer to prepare one separate bid packages with no additional <br /> compensation due the Designer. Such bid packages must be approved by Owner prior to submission and, at the Owner's option, may <br /> include but not be limited to: <br /> A. Demolition and preliminary site work; <br /> B. General work, plumbing, mechanical, electrical,fire protection; <br /> C. Landscaping and irrigation; <br /> D. Signage; <br /> E. Furniture. <br /> F. Water and sewer infrastructure <br /> G. <br /> 4.2 Prosect Cost Estimates <br /> 4.2.1 At the times designated herein,the Designer shall develop an estimate of the total cost of the Project (the "Total Project Cost"), <br /> including Designer's fees, costs of the construction, costs of equipment,furnishings, furniture and signage, permit fees and appropriate <br /> contingencies, and exclusions, where applicable.These costs shall be prepared and submitted to the Owner substantially in the format <br /> shown in Attachment C to this Agreement, with supporting documents listing quantities, unit price, labor rates, man-hour estimates, <br /> overhead and profit. Total Project Cost shall be mutually agreed upon by Owner and Designer as noted in paragraph 4.2.4. The timing <br /> of this Total Project Cost agreement shall be identified as a milestone in Attachment D. If cost estimating is not part of the project <br /> scope,the Total Project Cost shall be specified here: [BLANK] <br /> 4.2.2 Project cost estimates shall be prepared by qualified staff members of the Designer or the authorized Project Consultants listed <br /> on Attachment E, or a qualified cost estimating Consultant to the Designer who are acceptable to the Owner. <br /> 4.2.3 Total Project Cost estimates shall be prepared at N/A points in the production of the Designer's work: <br /> A. At completion of design; and <br /> B.At completion of ; and <br /> C. At completion of of the construction documents; and <br /> D. <br /> 4.2.4 If applicable per section 4.2.3, when the first of these estimates of Total Project Cost has been approved in writing by the Owner, <br /> it shall be used by the Owner as a basis for appropriating funds specifically for the Project. Once this Total Project Cost has been so <br /> approved by the Owner and the conditions of the project (cost environment,time schedule, etc.) are reasonably similar,the Designer <br /> 4 <br /> Revised 06/21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.