Browse
Search
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 03-21-2023 Business Meeting
>
Agenda - 03-21-2023; 8-d - Professional Services Award for Whitted Buildings HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 1:13:31 PM
Creation date
3/16/2023 1:08:46 PM
Metadata
Fields
Template:
BOCC
Date
3/21/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-d
Document Relationships
Agenda for March 21, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 03-21-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> Item on Form Definition <br /> Attach basis and justification for estimate. Include description,quantities,units, <br /> CURRENT ESTIMATED CONSTRUCTION COST special features,similar cost on recent projects,etc. <br /> A. 1. Demolition Includes but may not be limited to lead or asbestos testing and removal, building or <br /> interior space demolition in whole or part. <br /> A.2.Site Work Includes but may not be limited to grading,excavating, poor soils or rock removal, <br /> utilities relocation, roads,walks, parking,streambank repairs,stormwater <br /> management, retaining walls, rainwater harvesting systems,landscaping. <br /> Attach explanation of any special building, mechanical,or electrical service <br /> B. 1. Utility Services requirements with appropriate distance to existing buildings,water,gas,electrical or <br /> other utility service. <br /> B.9. Associated Construction Costs Includes but may not be limited to construction fire alarm testing, utility shut downs, <br /> utilities,signage,security,displaced parking,staging, lock cores, keys, permits. <br /> B. 10. Other List other signficant sources of cost not included elsewhere. Additional lines may be <br /> added if needed. <br /> PRECONSTRUCTION Includes but may not be limited to land surveys,lead/asbestos surveys, <br /> COSTS environmental assessments,copying, postage,costs of print advertising,and <br /> destructive testing. For CM at Risk,preconstruction costs are consistent with the <br /> requirements of the preconstruction services agreement. <br /> CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br /> omissions,concealed site conditions,utility conflicts,and extended overhead <br /> resulting from weather or other delay. <br /> 21 <br /> Revised 06/21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.