Orange County NC Website
20 <br /> Attachment A - Description of the Project <br /> Provide professional services for the Richard E. Whitted Buildings "A" and "B", which includes replacing the air cooled <br /> chiller, (2) condensing boilers, all chilled water and hot water pumps,new DDC controls, one air handler unit, coils, fans, <br /> dampers in built-up air handler units, replace elevator equipment room unit, replace (5) ductless split systems, and replacing <br /> approximately (50) vav boxes. <br /> 18 <br /> Revised 06/21 <br />