Browse
Search
3.8.23 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
3.8.23 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:44:53 PM
Metadata
Fields
Template:
BOCC
Date
3/8/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
3.8.23 PB Agenda Packet - Supplemental Materials
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2023
3.8.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
218 <br /> Owner: DOLLAR GENERAL PITTMAN SOIL CONSULTING <br /> Address: CORNER HWY 54 WHITE CROSS RD . PO BOX 1387 <br /> Location: CARRBORO, NC RICHLANDS,NC 28574 <br /> 910-330-2784 <br /> PROPERTY INFORMATION OBTAINED VIA NEWCOMB <br /> pittmansoil�yahoo.com <br /> LAND SURVEYORS, PLLC, DATED DUNE 8, 2022. <br /> ',ti,{ll llflflr, <br /> SCALE 111=60' <br /> f HAS PA KER�E—S.-A-D SEAL <br /> NGINEERING.WLCo. SoSS P ooENSNEERN43250 <br /> :.ouo: <br /> � rif ljllllY11114�` <br /> 129' <br /> / rr <br /> 0.-77��r <br /> I � <br /> _ M <br /> o <br /> Qti6o � <br /> 1 + 4q M h <br /> G Y <br /> O APPROVED <br /> PRESSURE MANI <br /> a j \1000 GALLON <br /> Lr PUMP TANK <br /> — --- � TtP�f B'.IFFfR <br /> 5 1500 GALLON <br /> SEPTIC TANK <br /> TYPICAL SOIL BORE INITIAL <br /> 0-12 SL,GR,VFR,NEXP,2.5Y 4/3 DOLLAR GENERAL 200 GPD <br /> -_• 12-24 SL GR VFR NEXP 2.5Y 6/4 LTAR.33 <br /> 24-30 CL SBK FI SS SP IOYR 5/8 4-60'CONVENTIONAL LINES <br /> G�!:t f 12-18"TB <br /> %:' 30-48 CL,SBK,FI,SS,SP, IOYR 5/8,2.5Y 6/1,7.5YR 5/8 <br /> >6"SOIL COVER REQUIRED OVER <br /> SOIL WETNESS 30 SYSTEM AND 5'BEYOND SYSTEM <br /> ' p e LTAR 0.33 GPD/SQFT <br /> REPAIR AREA <br /> DOLLAR GENERAL 200 GPD <br /> �. - LTAR.33 <br /> „ 4-60'CONVENTIONAL LINES <br /> l'4T �C2 12-18"TB <br /> NOR"M� >6"SOIL COVER REQUIRED OVER <br /> SYSTEM AND Y BEYOND SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.