Browse
Search
3.8.23 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
3.8.23 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:44:53 PM
Metadata
Fields
Template:
BOCC
Date
3/8/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
3.8.23 PB Agenda Packet - Supplemental Materials
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2023
3.8.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
167 <br /> Project: White Cross Retail Daily In Daily Out <br /> Location: Orange County,NC Net New Trips: 347 347 <br /> Ct.Date November 2,2022 Pass-By Trips: 0 0 <br /> N/S Street: White Cross Road <br /> E/W Street: NC 54 Annual Growth Rate: 1.25% Existing Year: 2022 <br /> Growth Factor: 0.025 Buildout Year: 2024 <br /> NC 54 NC 54 White Cross Road <br /> West of White Cross Road East of White Cross Road South of NC 54 <br /> 2022 Traffic Count 10,997 11,141 2,537 <br /> Count Balancing 0 0 0 <br /> 2022 Existing Traffic 10,997 11,141 2,537 <br /> Growth Factor(per year) 0.025 0.025 0.025 <br /> 2024 Background Growth 277 280 64 <br /> 2024 Background Traffic 11,274 11,421 2,601 <br /> Project Traffic <br /> Percent Assignment Inbound 35% 55% 10% <br /> Inbound Project Traffic 121 191 35 <br /> Percent Assignment Outbound 35% 55% 10% <br /> Outbound Project Traffic 121 191 35 <br /> Pass-By Capture Reduction 0 0 0 <br /> Pass-By Capture Assignment 0 0 0 <br /> Total Pass-By Traffic 0 0 0 <br /> Total Project Traffic 242 382 70 <br /> 2024 Buildout Total 11516 11803 2671 <br /> Approach Percent Impact(vs.Existing) 2.2% 3.4% 2.8% <br />
The URL can be used to link to this page
Your browser does not support the video tag.