Browse
Search
3.8.23 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
3.8.23 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:44:53 PM
Metadata
Fields
Template:
BOCC
Date
3/8/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
3.8.23 PB Agenda Packet - Supplemental Materials
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2023
3.8.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140 <br /> INTERSECTION ANALYSIS SHEET <br /> AM In AM Out PM In PM Out <br /> Project: White Cross Retail Net New Trips:1 18 13 41 42 <br /> Location: Orange County,NC Pass-By Trips: 0 0 0 1 0 <br /> Scenario: Study Scenario <br /> Cf.Date <br /> Cf.Peaks AM:xx-xx;PM:xx-xx <br /> N/S Street: White Cross Road Annual Growth Rate: 1.25% Existing Year: 2022 <br /> E/W Street: lSite Driveway GrowthFactor:1 0.025 BuildoutYear:1 2024 <br /> AM PEAK HOUR <br /> AM PHF= <br /> Site Driveway - White Cross Road White Cross Road <br /> Eastbound Westbound Northbound Southbound <br /> Description Left Through Right Left Through Right Left Through Right Left Through Right <br /> 2022 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Count Balancing 0 0 0 0 0 0 0 113 0 0 86 0 <br /> 2022 Existing Traffic 0 0 0 0 0 0 0 113 0 0 86 0 <br /> Growth Factor(0.0125 per year) 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 <br /> 2024 Background Growth 0 0 0 0 0 0 0 3 0 0 2 0 <br /> 2024 Background Traffic 0 0 0 0 0 0 0 116 0 0 88 0 <br /> Project Traffic <br /> Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 10% 0% 0% 0% 0% 90% <br /> Inbound Project Traffic 0 0 0 0 0 0 2 0 0 0 0 16 <br /> Percent Assignment Outbound 90% 0% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br /> Outbound Project Traffic 11 0 l 0 0 0 0 0 0 0 0 0 <br /> Total Project Traffic 11 0 l 0 0 0 2 0 0 0 0 16 <br /> 2024 Buildout Total II 0 1 0 0 0 2 116 0 0 88 16 <br /> Approach Percent Impact(vs.Existing) #DIV/01 #DIV/01 1.8% 18.6% <br /> Overall Percent Impact(vs.Buildout) 12.8% <br /> PM PEAK HOUR <br /> PM PHF= <br /> Site Driveway - White Cross Road White Cross Road <br /> Eastbound Westbound Northbound Southbound <br /> Description Left Through Right Left Through Right Left Through Right Left Through Right <br /> 2022 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Count Balancing 0 0 0 0 0 0 0 92 0 0 139 0 <br /> 2022 Existing Traffic 0 0 0 0 0 0 0 92 0 0 139 0 <br /> Growth Factor(0.0125 per year) 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 <br /> 2024 Background Growth 0 0 0 0 0 0 0 2 0 0 3 0 <br /> 2024 Background Traffic 0 0 0 0 0 0 0 94 0 0 142 0 <br /> Project Traffic <br /> Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 10% 0% 0% 0% 0% 90% <br /> Inbound Project Traffic 0 0 0 0 0 0 4 0 0 0 0 37 <br /> Percent Assignment Outbound 90% 0% 10% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br /> Outbound Project Traffic 38 0 4 0 0 0 0 0 0 0 0 0 <br /> Total Project Traffic 38 0 4 0 0 0 4 0 0 0 0 37 <br /> 2024 Buildout Total 38 0 4 0 0 0 j 4 94 0 0 142 37 <br /> Approach Percent Impact vs.Existing) #DIV/01 4.3% 26.6% <br /> Overall Percent Impact(vs.Buildout) 26.0% <br /> Uonley-haro.comise_durldur ldevl white cross retatllt4-analysisl[white cross retail-tia data sheet.xls]int.#2-site dray 11115122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.