Browse
Search
3.8.23 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
3.8.23 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:44:53 PM
Metadata
Fields
Template:
BOCC
Date
3/8/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
3.8.23 PB Agenda Packet - Supplemental Materials
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2023
3.8.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
124 <br /> Kimley)>)Horn White Cross Retail—Orange County, NC <br /> 6.1 NC 54— White Cross Road <br /> Analyses indicate that the unsignalized NC 54—White Cross Road intersection currently operates <br /> with moderate delays on the minor street approach (White Cross Road) in both peak hours. The <br /> minor street approach is projected to continue operating with moderate delays in both peak hours <br /> in 2024 with or without the proposed project in place. However, it is typical for stop sign <br /> controlled side streets and driveways intersecting major streets to experience long delays during <br /> peak hours, while the majority of the traffic moving through the intersection on the major street <br /> experiences little or no delay. Furthermore, Synchro indicates that minor street queues are <br /> projected to be less than 100 feet in the peak hours and that the addition of site traffic is expected <br /> to result only in a minor increase in delays and queues. <br /> Therefore,no improvements are recommended at this intersection. <br /> Table 6.1 summarizes the operation of the intersection for the existing and projected (2024) <br /> background and build-out traffic conditions. <br /> Table 6.1 <br /> Level-of-Service <br /> NC 54—White Cross Road (Unsignalized) <br /> Condition AM Peak Hour PM Peak Hour <br /> LOS (Delay) LOS (Delay) <br /> Existing(2022) Traffic NB—D(34.2) NB—D (31.6) <br /> WBL—B 10.6 WBL—A 8.2 <br /> Background(2024)Traffic NB—E(37.2) NB—D (34.1) <br /> WBL—B 10.7 WBL—A 8.3 <br /> Build-out(2024)Traffic NB—E(43.4) NB—E(48.3) <br /> WBL—B 10.9 WBL—A 8.4 <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.