Browse
Search
3.8.23 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
3.8.23 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:44:53 PM
Metadata
Fields
Template:
BOCC
Date
3/8/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
3.8.23 PB Agenda Packet - Supplemental Materials
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2023
3.8.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> Kimley)>)Horn White Cross Retail—Orange County, NC <br /> LIST OF TABLES <br /> Table No. Title Page No. <br /> Table 3.1 ITE Traffic Generation(Vehicles)..........................................................................5 <br /> Table 6.0 Level-of-Service Control Delay Thresholds.........................................................12 <br /> Table 6.1 Level of Service:NC 54-White Cross Road.......................................................13 <br /> Table 6.2 Level of Service: White Cross Road- Site Driveway...........................................14 <br /> Table 7.1 Daily Traffic Volume Summary...........................................................................15 <br /> LIST OF FIGURES <br /> Figure No. Title Page No. <br /> Figure2.1 Site Location...........................................................................................................3 <br /> Figure 2.2 Existing Roadway Laneage.....................................................................................4 <br /> Figure 4.1 Site Traffic Distribution and Percent Assignment..................................................7 <br /> Figure 5.1 Existing and Background(2024)Peak Hour Traffic Volumes...............................9 <br /> Figure 5.2 Projected(2024)Build-out AM Peak Hour Traffic Volumes...............................10 <br /> Figure 5.3 Projected(2024)Build-out PM Peak Hour Traffic Volumes ...............................11 <br /> Figure 8.1 Recommended Roadway Laneage........................................................................17 <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.