Browse
Search
3.8.23 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2023
>
3.8.23 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 4:54:03 PM
Creation date
3/2/2023 4:44:53 PM
Metadata
Fields
Template:
BOCC
Date
3/8/2023
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
3.8.23 PB Agenda Packet - Supplemental Materials
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2023
3.8.23 PB Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
100 <br /> E <br /> D Estimated square.footage.of area to be.graded for develojo ent of attached,residential units <br /> exc uding roads,but including.parking areas) <br /> E. Estimated square footage of area to be:graded.for non-rest ential use (excluding roads) <br /> U <br /> j D _ QiPiY <br /> F..Estimated area to be graded for roads <br /> ■ Road type: ❑ Public ❑ Private <br /> ❑ Class A <br /> ❑ Class B <br /> ■ Total road length: <br /> �Ili 5#ata Perrinits`Requlr'ed <br /> A Does the projec#involve the mming of earth products? ❑ Yes No <br /> ■ If yes, how many cubic feet of material are expected to bo excavated? <br /> ■ Has an application for a Mining Permit been submitted to NCDRCD? ❑ Yes WNo <br /> Please attach map indicating expected extent of proposed activity <br /> B Dbes the projeet Involve generation or storage..of haaardous or toxic wastes, as,iden#ified by <br /> the Environment I Protection i.gency? <br /> 1 <br /> ❑ Yes CPNo <br /> ■ Describe the wastes to be generated: <br /> ■ How much material is expected to be generated per mon# ? <br /> ■ Will any material be treated onsite? ❑ Yes ❑ No If yes, i; dicate volume: <br /> Will any material be stored onsite? ❑ Yes ❑ No If yes, indicate volume: <br /> ■ Where will disposal of the material take place? <br /> ■ How will materials be transported to the disposal site? <br /> ■ What measures are proposed to protect water quality and'air quality in case of <br /> spills? <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.