Orange County NC Website
5 <br /> THE UNIVERSITY <br /> Of NORTH CAROLINA GREGORY A.DRt-,'FR,1_'E <br /> 1 <br /> at CHAPEL HILL Eeecutive Director-1 University FnRineer <br /> Enioneenng a Co-struction,Facilities Services <br /> 1111 A,,p.n nave 1:919.813.0156 <br /> t',,,,p,,,Ru.-1821 ..ww.F—lmes.unc.edu <br /> Chanel Hill,NC 2751)1) =gdnvedn)fac.unceriu <br /> June 10, 2019 <br /> James Barker <br /> Hazard Mitigation Specialist <br /> binrth Carolina Department of Public Safety <br /> Division of Emergency Management, Recovery Section, Hazard Mitigation Rranch <br /> Mailing Address:4238 Mail Service Center, Raleigh, NC 27699-4238 <br /> Physical Address: 41% Reedy Creek Road, Raleigh, NC 27607-6410 <br /> office: 919-KS-2355 <br /> Fax: 919-71S-9191 <br /> bnh.barker@ncdps.gnv <br /> Dear Mr. Barker: <br /> After careful consideration of the input from the University's Director of Emergency Managpment& <br /> Planning, our Spnnr Electrical Engineer(Licensed Profpssinnal Engineer),our Executive Director of <br /> Environment Health &Safety, our Generator Shop Supervisnr, our Facilities Conditions Assessment <br /> Program,and our Energy Services group, I confirm the 3onKW size is the appropriate generator size to <br /> support the critical Inads at UNC-CH's Fmergency Operations Center_ These nperations include <br /> utilization of the entire building for the university's emergency personnel and potentially sheltering of <br /> these personnel during a campus emergency event. <br /> The authority having jurisdiction for this location is the State of North Carnlina.This system will be <br /> designed by a Professional Engineer licensed in the state of North Carolina and will meet nr exceed the <br /> current North Carolina Building Cndp, National Electric Code, and University and State Construction <br /> office standards. Final inspection will be conducted by the University and State Constructinn Office. <br /> sinter ly, <br /> egory A. Driver <br />