Orange County NC Website
e F a u,~~' <br />'~~~ ORANGE COUNTY RECREATION & T'ARKS ~.. <br />.-..w. <br />'"`'~, ~ P.O. Box 8181 <br />300 West Tryon Street <br />Hillsborough, NC 27278 <br />Orange County Phone: 919-245-2660 Fax 919-644-.3042 <br />Recreation & Parks <br />NORTHERN PARK <br />OPERATIONSandMAINTENANCE <br />PRELIMINARY COST ESTIMATES <br />The addition of 48 acres of developed pazltland will bring related operational functions and the designation <br />of additional resources. At this time, staff estimates annual operating costs to range between $$214,793 and <br />$255,634, with stazt-up capital expenses also vaz•ying between $66,850 and $124,150, depending on further <br />research, future discussions, and final decisions as made by the BOCC as part of the annual budget process. <br />Costs associated with the start up and initial operation and maintenance of the Northern Park are azrticipated <br />to be a part of the BOCC budget malting process no sooner than Fiscal 2006-2007, The cost ranges presented <br />here are inclusive of persormel, operations (such as telephone, equipment rental and repair, supplies), and <br />capital equipment (such as mowers, blowers, miscellaneous tools.) and represent staff's best estimate on <br />projected needs based upon the park development plan being discussed by the BOCC at this work session. <br />The most significant decision points impacting future costs ar•e identified below: <br />Whether or not to install a gate at the back section of the park -The baclt section of the park, <br />containing one ball field, multi-purpose field, picnic shelter, walking track and trails in the proposed <br />phase I is heavily wooded. Most of this section of the park will not be visible from Highway 86 or <br />even from the "front" portion of the park. The back of the park backs up to a water body and is <br />adjacent to several private properties. Agate, preventing vehicular access to this portion of the park <br />would assist in limiting undesirable activity after dark or after scheduled activity at the lighted fields. <br />Installing a gate is estimated to increase operational costs by $7,800 annually. <br />Whether or not to build a sltate park within the park -Staff has attended training sessions and <br />had conversations with other parks agencies and experts in the field of risk management including the <br />Risk Management Croup of the North Carolina County Commissioners Association. Based on the <br />information gained from these sources, staff recommends that a skate park, if constructed, be <br />unsupervised, and fenced, but not locked. (Operating costs associated with staffing a skate park are <br />estimated at $32,800 annually.) Lights would be on a timer, and appropriate signage, which <br />addresses issues of hours, safety, risk, etc. would be included. Daily maintenance would still be <br />required. <br />Should the BOCC wish to include a sltate pant in the final Master Plan, it would be necessary for <br />staff to focus more closely on the design of the internal components of the skate pant as working <br />drawings progress. This process would benefit from the advice of skate park design firms as well as <br />potential users of the facility. Staff in this case would like to convene a focus group consisting of <br />bike riders, in-line skaters and skateboarders to work with staff on this design. No cost outside of <br />staff time would be associated with implementing this idea. <br />