Orange County NC Website
27 <br /> Determ *in 'i' ng 1Cost <br /> Rough Order of Magnitude Cost Estimates are underway for <br /> preliminary concepts to solve space needs <br /> Building Cost are increasing <br /> Preliminarily Estimates thus far: <br /> • Cost are Escalated to 2025 <br /> • New Construction $540 / SF to $625 / SF * <br /> * Includes sustainable strategies such as LEED GOLD certification standards <br />