Orange County NC Website
9 <br /> Develop construction dmwings and bids, gain site plan improved, award bid <br /> to contractor(s)and construct the park facilities according to the BOCC- <br /> advptedplan. <br /> _ $27SeNiws <br /> Cooner <br /> Cooner <br /> Ren end Parks Management Director <br /> Pug Director <br /> Opce Design Specialist <br /> Cogineer <br /> ERtor <br /> Plairector <br /> Paices Director <br /> "Best-Case' Construction Begins: October,2003 <br /> If the Board is ready to proceed with planning for this park: <br /> 1. Create Efland-Cheeks Park Work Group to review the existing concept <br /> plan for the park for adequacy and changed conditions, and amend as <br /> needed. <br /> 2. Adopt operating principles for Work Group, as needed <br />