Orange County NC Website
v <br /> Projected Concept Plan Trig May 2002—February 2993 <br /> Target Date for BOCC Consideration?: March 2003 <br /> D velrp cunetruction drawings and bldg, gain Town acts plan (Conditional <br /> Use Permit)approval, award bid to comractor(a)and construct the park <br /> (acidities according to the➢OCC-adopted plan. <br /> $1,'go,000 <br /> Commissioner <br /> Commissioner <br /> Recreation and Packs Management Director <br /> Purchasing Direcbr <br /> Open Space Design Specialist <br /> ERG Director <br /> County Engineer <br /> Planning Director <br /> Park Services Director <br /> "Best-Case' Construction Begins: February,2004 <br /> * - Planning far this project will use a special Master Plan Process, adopted by <br /> the Board, to jointly plan the schools campus and park(to the degree possible). <br /> If the Boartl is ready to proposal with Master Plan for this park: <br /> 1. Adopt Master Plan Process (with operating guidelines, etc) <br /> 2. Appoint Chapel Hill Township Park and Educational Campus Master <br /> Plan Work Group, with charge and mission (scope of work), based on <br /> pre-ooncept plan and operating principles in the adopted process. <br />