Orange County NC Website
11 <br /> Develop construction drawings and baba, gain neon site plan approval, <br /> award bid to contmrlor(s)and construct the park facilities occurding In the <br /> BOCC adopted plan. <br /> W$8 <br /> 4 <br /> 0 <br /> ,00 <br /> 0 <br /> Commissioner <br /> Commissioner <br /> Recreation and Parks Management Director <br /> Pumhasing Director <br /> Open Space Design Specialist <br /> County Engineer <br /> ERC Director <br /> Planning Director <br /> Park Services Director <br /> Projecled Continuation Begins: February,2004 <br /> At . n,Id t,pa„,d of hLo tom: <br /> If the Board is ready to proposal with planning for this park: <br /> 1. Create a BOCC workgroup to meet with like contingent from <br /> H lllsborough to discuss joint Park opportunities and scope of project <br /> 2. Once key decisions made, develop and adopt pre-concept plan <br /> 3. Appoint. the Falrvlear Park Concept Plan Committee, with charge and <br /> mission (scope of work), based on preconcept plan and any operating <br /> principles the Board wishes to apply. <br />