Browse
Search
Agenda - 04-30-2002 - 5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 04-30-2002
>
Agenda - 04-30-2002 - 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 2:59:34 PM
Creation date
8/29/2008 10:38:17 AM
Metadata
Fields
Template:
BOCC
Date
4/30/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
5
Document Relationships
Minutes - 20020430
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> Project Name: Fairview Park <br /> Project Cost: $850.000 <br /> Prtn Concept Plan Completed? No <br /> PrI Statue: Existing playground and playing field Decisions needed on <br /> whether park will include both County and Town of Hillsborough portions or <br /> County only, whether a joint CountyROWn park or a County park, and whether <br /> perk plan will include master plan for other pudic facilities. Funds from 2001 <br /> bond, appropriated accordingly in 2002-2012 CIP, consistent with following <br /> timetable. There is no pre+.nncapt plan or concept plan. <br /> Srope of Work discuss ouxmrWing issues with town ofhilleborough.DevelogI <br /> concept plan. Form concept plan committee to design park, aintipre-concepiplan and <br /> operriongprinciples adopredospart of the chl by the Board ofCOmmissioners. <br /> $ 00 for detelled curve <br /> of Hlllsborou h? <br /> missioner <br /> missioner <br /> sborough Town Commissioner <br /> Recreation and Parks Advisory Council member <br /> mmission for the Environment member <br /> a Citizens <br /> osn desi n rofessional/other ex amiss <br /> ry: Open Space Design Specialist, ERG <br /> tor, Recreation antl Parks Management Director <br /> r: Land Conservation Manager, County <br /> neer, Planning Director(County antl Town), <br /> hasing Director, Public Works Director, others as <br /> ed <br /> Projected Concept Plan Timetable': Januarv-Mav2003 <br /> Tamer Date for BOCC Conskleretlon?: Jupa.204$ <br /> ` -after outstanding Issues resolved by BOCC work group <br />
The URL can be used to link to this page
Your browser does not support the video tag.