Orange County NC Website
The original (Contract Sum)$35,167.12 <br />Net change by previously authorized Change Orders $4,500.00 <br />The contract sum prior to this Change Order was $39,667.12 <br />The contract sum would be changed by this Change Order in the amount of $0.00 <br />The new contract sum including this Change Order will be $39,667.12 <br />The contract time will not be changed by this Change Order. <br />    C.T. Wilson Construction Co <br />  150 Golden Dr. Suite 200 <br />      Durham, North Carolina 27705 <br />      <br />      <br />ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate  ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate <br />SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE <br /> <br />C.T. Wilson Construction Page 2 of 2 Printed On: 2/17/2023  10:05 AM <br /> <br /> <br /> <br />PCCO #003 <br />DocuSign Envelope ID: 873C65E4-1432-403D-8FA7-117DAC9313BB <br />2/17/2023 <br />DocuSign Envelope ID: 1B50AF0F-E277-48C1-A2A4-F34475D3BB76